Estimate for interstage water injection in air compressor incorporated into gas-turbine cycles and combined power plants cycles


Цитировать

Полный текст

Открытый доступ Открытый доступ
Доступ закрыт Доступ предоставлен
Доступ закрыт Только для подписчиков

Аннотация

The objects of study are the gas turbine (GT) plant and combined cycle power plant (CCPP) with opportunity for injection between the stages of air compressor. The objective of this paper is technical and economy optimization calculations for these classes of plants with water interstage injection. The integrated development environment “System of machine building program” was a tool for creating the mathematic models for these classes of power plants. Optimization calculations with the criterion of minimum for specific capital investment as a function of the unit efficiency have been carried out. For a gas-turbine plant, the economic gain from water injection exists for entire range of power efficiency. For the combined cycle plant, the economic benefit was observed only for a certain range of plant’s power efficiency.

Об авторах

A. Kler

Melentiev Energy Systems Institute SB RAS

Email: contain@mail.ru
Россия, Irkutsk

Yu. Zakharov

Melentiev Energy Systems Institute SB RAS

Автор, ответственный за переписку.
Email: contain@mail.ru
Россия, Irkutsk

Yu. Potanina

Melentiev Energy Systems Institute SB RAS

Email: contain@mail.ru
Россия, Irkutsk


© Pleiades Publishing, Ltd., 2017

Данный сайт использует cookie-файлы

Продолжая использовать наш сайт, вы даете согласие на обработку файлов cookie, которые обеспечивают правильную работу сайта.

О куки-файлах