Estimate for interstage water injection in air compressor incorporated into gas-turbine cycles and combined power plants cycles


Дәйексөз келтіру

Толық мәтін

Ашық рұқсат Ашық рұқсат
Рұқсат жабық Рұқсат берілді
Рұқсат жабық Тек жазылушылар үшін

Аннотация

The objects of study are the gas turbine (GT) plant and combined cycle power plant (CCPP) with opportunity for injection between the stages of air compressor. The objective of this paper is technical and economy optimization calculations for these classes of plants with water interstage injection. The integrated development environment “System of machine building program” was a tool for creating the mathematic models for these classes of power plants. Optimization calculations with the criterion of minimum for specific capital investment as a function of the unit efficiency have been carried out. For a gas-turbine plant, the economic gain from water injection exists for entire range of power efficiency. For the combined cycle plant, the economic benefit was observed only for a certain range of plant’s power efficiency.

Авторлар туралы

A. Kler

Melentiev Energy Systems Institute SB RAS

Email: contain@mail.ru
Ресей, Irkutsk

Yu. Zakharov

Melentiev Energy Systems Institute SB RAS

Хат алмасуға жауапты Автор.
Email: contain@mail.ru
Ресей, Irkutsk

Yu. Potanina

Melentiev Energy Systems Institute SB RAS

Email: contain@mail.ru
Ресей, Irkutsk

Қосымша файлдар

Қосымша файлдар
Әрекет
1. JATS XML

© Pleiades Publishing, Ltd., 2017