This article presents the results of testing two parallel operating three-phase power transformers with different transformation factors. The practical operation of power engineering systems often makes it necessary to split up the substation transformer capacity, which usually requires installing two parallel transformers instead of one, though with the same total power. The problem arises from this replacement of how to ensure uniform load distribution between the transformers. In the case of similarly designed transformers of equal power uniform load distribution is ensured automatically due to symmetrical parallel circuits. However, if differently designed transformers with different transformation factors are enabled in parallel, the uniformity of load distribution between them will be violated. It has been proven by testing that, with increasing total load, parallel operating transformers with very different transformation factors decrease the consumption of current by windings of the transformer with a higher transformation factor.

作者简介

A. Romodin

Perm National Research Polytechnic University

编辑信件的主要联系方式.
Email: journal-elektrotechnika@mail.ru
俄罗斯联邦, Komsomol’skii pr. 29, Perm, 614990

M. Kuznetsov

Perm National Research Polytechnic University

Email: journal-elektrotechnika@mail.ru
俄罗斯联邦, Komsomol’skii pr. 29, Perm, 614990

补充文件

附件文件
动作
1. JATS XML

版权所有 © Allerton Press, Inc., 2016