Improvement of Pipe Pushing Method


Дәйексөз келтіру

Толық мәтін

Ашық рұқсат Ашық рұқсат
Рұқсат жабық Рұқсат берілді
Рұқсат жабық Тек жазылушылар үшін

Аннотация

In focus is improvement of hole-making technology by vibro hammer pushing with batch-wise removal of soil core while a pipe is driven in soil under impact loading. The important advantage of the technology is the concurrent pipe driving and soil core removal. The minimal air pressure required to separate a core and transport it along the pipe is determined. The frequency of soil core separation and transport during vibro-hammer driving of pipes in soil has been tested in underground construction of utilities. The tests prove the possibility to cut-down time of trenchless construction of underground passages and to raise the level of mechanization of the operations.

Авторлар туралы

B. Danilov

Chinakal Institute of Mining, Siberian Branch

Хат алмасуға жауапты Автор.
Email: bbdanilov@mail.ru
Ресей, Krasnyi pr. 54, Novosibirsk, 630091

A. Kondratenko

Chinakal Institute of Mining, Siberian Branch

Email: bbdanilov@mail.ru
Ресей, Krasnyi pr. 54, Novosibirsk, 630091

B. Smolyanitsky

Chinakal Institute of Mining, Siberian Branch

Email: bbdanilov@mail.ru
Ресей, Krasnyi pr. 54, Novosibirsk, 630091

A. Smolentsev

Chinakal Institute of Mining, Siberian Branch

Email: bbdanilov@mail.ru
Ресей, Krasnyi pr. 54, Novosibirsk, 630091

Қосымша файлдар

Қосымша файлдар
Әрекет
1. JATS XML

© Pleiades Publishing, Ltd., 2017