Browse Title Index

Issue Title File
Vol 53, No 3 (2017) Erratum to: “Mining pollution control using biogrouting”
Olfati M., Doostmohammadi R., Roodsari F.G.
Vol 52, No 6 (2016) Erratum to: “Optimal extraction sequence modeling for open pit mining operation considering the dynamic cutoff grade”
Moosavi E., Gholamnejad J.
Vol 53, No 3 (2017) Erratum to: “Studying the Variation of Rotor Pressing Forces and Horizontal Soil Pressure during Shield Tunneling”
Voznesenky A.S., Mazein S.V.
Vol 52, No 4 (2016) Erratum to: “Twin Tunnel behavior under static and dynamic loads of Shiraz Metro, Iran”
Shirinabadi R., Moosavi E.
Vol 54, No 3 (2018) Erratum to: Effect of Tannin on Compound Collector Adsorption and Stibnite and Arsenopyrite Flotation from Complex Ore
Matveeva T.N., Gromova N.K., Lantsova L.B.
Vol 54, No 1 (2018) Erratum to: Energy-Based Volumetric Rock Destruction Criterion in the Rotary–Percussion Drilling Technology Improvement
Oparin V.N., Timonin V.V., Karpov V.N., Smolyanitsky B.N.
Vol 53, No 5 (2017) Erratum to: Publisher’s Erratum
Adushkin V.V., Kishkina S.B., Kulikov V.I., Pavlov D.N., Anisimov V.N., Saltykov N.V., Sergeev S.V., Spungin V.G., Oparin V.N., Kiryaeva T.A., Potapov V.P., Baryakh A.A., Samodelkina N.A., Li C., Zhou X., You S., Ibragimov J.J., Ul’yanova E.V., Malinnikova O.N., Burchak A.V., Balalaev A.K., Baranovsky V.I., Moosavi E., Shirinabadi R., Rahimi E., Gholinejad M., Smolyanitsky B.N., Chanyshev A.I., Cheshchin D.O., Anferov V.N., Kovalenko R.K., Erem’yants V.E., Panishev S.V., Kaimonov M.V., Kumykova T.M., Kumykov V.K., Chanturia V.A., Bunin I.Z., Ryazantseva M.V., Chanturia E.L., Khabarova I.A., Koporulina E.V., Anashkina N.E., Kondrat’ev S.A., Burdakova E.A., Algebraistova N.K., Burdakova E.A., Romanchenko A.S., Markova A.S., Kolotushkin D.M., Antonov A.V., Mikhailov A.G., Kharitonova M.Y., Vashlaev I.I., Sviridova M.L., Alekseev V.S., Banshchikova T.S., Rimkevich V.S., Sorokin A.P., Pushkin A.A., Girenko I.V., Barnov N.G., Lavrinenko A.A., Lusinyan O.G., Chikhladze V.V., Řehoř M., Jarolimová M., Žižka L., Schmidt P., Vráblík P., Vráblíková J., Oparin V.N., Yushkin V.F., Klimko V.K., Rublev D.E., Izotov A.S., Ivanov A.V.
Vol 52, No 3 (2016) Estimate of blow frequency range for an air drill hammer with a ring-shaped elastic valve in the backstroke exhaust line
Chervov V.V., Smolyanitsky B.N., Tishchenko I.V.
Vol 53, No 5 (2017) Estimation of Influence Exerted by Powered Closure Stability of Elastic Valve on Efficiency of Air Hammers
Chervov V.V., Tishchenko I.V.
Vol 52, No 4 (2016) Estimation of main fracture initiation energy in separating stone blocks from rock mass by impact on plastic material in drillhole
Tambovtsev P.N.
Vol 53, No 1 (2017) Estimation of Stress State in Rocks and Geomaterials
Seredin V.V., Khrulev A.S., Pushkareva M.V.
Vol 54, No 5 (2018) Estimation Procedure of Influence Exerted by Trigger Effects in Rock Mass on Technical Condition of Long-Term Operated Underground Structures
Abramov N.N.
Vol 52, No 6 (2016) Evaluating the use of mineral pumice in falling zones of internal pressure tunnels (Case study: Water transfer tunnel of Sardasht dam power plant)
Haeri H., Tavakoli H., Shemirani A.B., Sarfarazi V., Farazmand M.
Vol 53, No 3 (2017) Evaluation of Additional Iron Recovery from Iron Ore Tailings
Yakubailik E.K., Balaev A.D., Ganzhenko I.M.
Vol 55, No 1 (2019) Evaluation of Drum Shearer Capacity in Coal Seam with Variable Geomechanical and Geotechnical Characteristics
Ordin A.A., Okol’nishnikov V.V., Rudometov S.V., Metel’kov A.A.
Vol 53, No 1 (2017) Evaluation of Layout of Air Drill Hammer with Smooth Adjustment of Impact Impulse Frequency
Tishchenko I.V., Chervov V.V., Smolyanitsky B.N.
Vol 52, No 2 (2016) Evaluation of technological parameters for apatite extraction by surface miners
Ordin A.A., Schwabenland E.E.
Vol 55, No 5 (2019) Evaluation of the Effect of Coal Seam Dip on Stress Distribution and Displacement around the Mechanized Longwall Panel
Damghani M., Rahmannejad R., Najafi M.
Vol 52, No 4 (2016) Evaluation of ventilation flow charts for double-line subway tunnels without air chambers
Krasyuk A.M., Lugin I.V., Alferova E.L., Kiyanitsa L.A.
Vol 52, No 3 (2016) Evolution of stresses and permeability of fractured-and-porous rock mass around a production well
Nazarova L.A., Nazarov L.A.
Vol 53, No 1 (2017) Experience in the Adoption of Room & Pillar Mining Method in the Company OKD, a.s., Czech Republic
Hudeček V., Šancer J., Zubíček V., Golasowski J.
Vol 53, No 2 (2017) Experience of destressing slotting to prevent gas-dynamic events in mechanized carnallite mining
Nesterova S.Y.
Vol 53, No 6 (2017) Experimental Estimate of Fracture Permeability with Proppant Made of Alumosilicate Microspheres in Shallow Hydraulic Fracturing in Oil Reservoirs
Shilova T.V., Kurlenya M.V., Serdyukov S.V.
Vol 52, No 5 (2016) Experimental estimate of power variation range of pneumatic hammer with mechanical locking of elastic valve
Chervov V.V., Smolyanitsky B.N.
Vol 53, No 5 (2017) Experimental Investigation of Change in the Contrast between Flotation Properties of Calcic Minerals
Ignatkina V.A.
151 - 175 of 529 Items << < 2 3 4 5 6 7 8 9 10 11 > >>