浏览标题索引

标题 文件
卷 53, 编号 3 (2017) Erratum to: “Mining pollution control using biogrouting”
Olfati M., Doostmohammadi R., Roodsari F.
卷 52, 编号 6 (2016) Erratum to: “Optimal extraction sequence modeling for open pit mining operation considering the dynamic cutoff grade”
Moosavi E., Gholamnejad J.
卷 53, 编号 3 (2017) Erratum to: “Studying the Variation of Rotor Pressing Forces and Horizontal Soil Pressure during Shield Tunneling”
Voznesenky A., Mazein S.
卷 52, 编号 4 (2016) Erratum to: “Twin Tunnel behavior under static and dynamic loads of Shiraz Metro, Iran”
Shirinabadi R., Moosavi E.
卷 54, 编号 3 (2018) Erratum to: Effect of Tannin on Compound Collector Adsorption and Stibnite and Arsenopyrite Flotation from Complex Ore
Matveeva T., Gromova N., Lantsova L.
卷 54, 编号 1 (2018) Erratum to: Energy-Based Volumetric Rock Destruction Criterion in the Rotary–Percussion Drilling Technology Improvement
Oparin V., Timonin V., Karpov V., Smolyanitsky B.
卷 53, 编号 5 (2017) Erratum to: Publisher’s Erratum
Adushkin V., Kishkina S., Kulikov V., Pavlov D., Anisimov V., Saltykov N., Sergeev S., Spungin V., Oparin V., Kiryaeva T., Potapov V., Baryakh A., Samodelkina N., Li C., Zhou X., You S., Ibragimov J., Ul’yanova E., Malinnikova O., Burchak A., Balalaev A., Baranovsky V., Moosavi E., Shirinabadi R., Rahimi E., Gholinejad M., Smolyanitsky B., Chanyshev A., Cheshchin D., Anferov V., Kovalenko R., Erem’yants V., Panishev S., Kaimonov M., Kumykova T., Kumykov V., Chanturia V., Bunin I., Ryazantseva M., Chanturia E., Khabarova I., Koporulina E., Anashkina N., Kondrat’ev S., Burdakova E., Algebraistova N., Burdakova E., Romanchenko A., Markova A., Kolotushkin D., Antonov A., Mikhailov A., Kharitonova M., Vashlaev I., Sviridova M., Alekseev V., Banshchikova T., Rimkevich V., Sorokin A., Pushkin A., Girenko I., Barnov N., Lavrinenko A., Lusinyan O., Chikhladze V., Řehoř M., Jarolimová M., Žižka L., Schmidt P., Vráblík P., Vráblíková J., Oparin V., Yushkin V., Klimko V., Rublev D., Izotov A., Ivanov A.
卷 52, 编号 3 (2016) Estimate of blow frequency range for an air drill hammer with a ring-shaped elastic valve in the backstroke exhaust line
Chervov V., Smolyanitsky B., Tishchenko I.
卷 53, 编号 5 (2017) Estimation of Influence Exerted by Powered Closure Stability of Elastic Valve on Efficiency of Air Hammers
Chervov V., Tishchenko I.
卷 52, 编号 4 (2016) Estimation of main fracture initiation energy in separating stone blocks from rock mass by impact on plastic material in drillhole
Tambovtsev P.
卷 53, 编号 1 (2017) Estimation of Stress State in Rocks and Geomaterials
Seredin V., Khrulev A., Pushkareva M.
卷 54, 编号 5 (2018) Estimation Procedure of Influence Exerted by Trigger Effects in Rock Mass on Technical Condition of Long-Term Operated Underground Structures
Abramov N.
卷 52, 编号 6 (2016) Evaluating the use of mineral pumice in falling zones of internal pressure tunnels (Case study: Water transfer tunnel of Sardasht dam power plant)
Haeri H., Tavakoli H., Shemirani A., Sarfarazi V., Farazmand M.
卷 53, 编号 3 (2017) Evaluation of Additional Iron Recovery from Iron Ore Tailings
Yakubailik E., Balaev A., Ganzhenko I.
卷 55, 编号 1 (2019) Evaluation of Drum Shearer Capacity in Coal Seam with Variable Geomechanical and Geotechnical Characteristics
Ordin A., Okol’nishnikov V., Rudometov S., Metel’kov A.
卷 53, 编号 1 (2017) Evaluation of Layout of Air Drill Hammer with Smooth Adjustment of Impact Impulse Frequency
Tishchenko I., Chervov V., Smolyanitsky B.
卷 52, 编号 2 (2016) Evaluation of technological parameters for apatite extraction by surface miners
Ordin A., Schwabenland E.
卷 55, 编号 5 (2019) Evaluation of the Effect of Coal Seam Dip on Stress Distribution and Displacement around the Mechanized Longwall Panel
Damghani M., Rahmannejad R., Najafi M.
卷 52, 编号 4 (2016) Evaluation of ventilation flow charts for double-line subway tunnels without air chambers
Krasyuk A., Lugin I., Alferova E., Kiyanitsa L.
卷 52, 编号 3 (2016) Evolution of stresses and permeability of fractured-and-porous rock mass around a production well
Nazarova L., Nazarov L.
卷 53, 编号 1 (2017) Experience in the Adoption of Room & Pillar Mining Method in the Company OKD, a.s., Czech Republic
Hudeček V., Šancer J., Zubíček V., Golasowski J.
卷 53, 编号 2 (2017) Experience of destressing slotting to prevent gas-dynamic events in mechanized carnallite mining
Nesterova S.
卷 53, 编号 6 (2017) Experimental Estimate of Fracture Permeability with Proppant Made of Alumosilicate Microspheres in Shallow Hydraulic Fracturing in Oil Reservoirs
Shilova T., Kurlenya M., Serdyukov S.
卷 52, 编号 5 (2016) Experimental estimate of power variation range of pneumatic hammer with mechanical locking of elastic valve
Chervov V., Smolyanitsky B.
卷 53, 编号 5 (2017) Experimental Investigation of Change in the Contrast between Flotation Properties of Calcic Minerals
Ignatkina V.
151 - 175 的 529 信息 << < 2 3 4 5 6 7 8 9 10 11 > >>