Issue |
Title |
File |
Vol 53, No 6 (2017) |
Economic Expediency of Copper Ore Mining with Waste Rock Fill of Secondary Stopes in the West Wing of the Oktyabrsky Deposit |
 (Eng)
|
Uskov V.A., Kondrat’ev S.A., Neverov S.A.
|
Vol 53, No 6 (2017) |
Improvement of Support Technology in Artemevsk Mine of Vostoktsvetmet |
 (Eng)
|
Krupnik L.A., Shaposhnik Y.N., Shokarev D.A., Shaposhnik S.N., Konurin A.I.
|
Vol 53, No 6 (2017) |
Predicting Variation in Volume Density of Titanium–Magnetite Ore with Depth at the Gusevogorsk Deposit, Middle Ural |
 (Eng)
|
Kantemirov V.D., Yakovlev A.M., Titov R.S.
|
Vol 53, No 5 (2017) |
Methane Explosions and Causes of Their Origin in Highly Productive Sections of Coal Mines |
 (Eng)
|
Kurlenya M.V., Skritsky V.A.
|
Vol 53, No 5 (2017) |
Specific Features of Iron Ore Mining in Gornaya Shoria |
 (Eng)
|
Eremenko A.A., Filippov V.N., Nikitenko S.M., Khristolyubov E.A.
|
Vol 53, No 5 (2017) |
Technology and Ecology of Dumping at Open Pit Mines in Kuzbass |
 (Eng)
|
Cheskidov V.I., Bobyl’sky A.S.
|
Vol 53, No 3 (2017) |
Improvement of Design and Installation of Injection Rock Bolt Support |
 (Eng)
|
Ignat’ev R.A., Ignat’ev E.R.
|
Vol 53, No 3 (2017) |
Enhancing Efficiency of Rock Crushing Screening Utilization |
 (Eng)
|
Kapustin F.L., Perepelitsyn V.A., Ponomarev V.B., Loshkarev A.B.
|
Vol 53, No 3 (2017) |
Assessment of Influence of Voids on Phase II Mining Safety at Artemievsk Deposit |
 (Eng)
|
Shaposhnik Y.N., Neverov A.A., Neverov S.A., Nikol’sky A.M.
|
Vol 53, No 3 (2017) |
Promising Mining Technologies for Gold Placers in Transbaikalia |
 (Eng)
|
Oparin V.N., Sekisov A.G., Trubachev A.I., Smolyanitsky B.N., Salikhov V.S., Zykov N.V.
|
Vol 53, No 3 (2017) |
Optimizing Cupriferous Ore Output at Oktyabrsky Copper–Nickel Deposit, Considering Lag Factor |
 (Eng)
|
Ordin A.A., Vasil’ev I.V.
|
Vol 53, No 3 (2017) |
Support Design for Mines Exposed to Rockburst Hazard |
 (Eng)
|
Louchnikov V.N., Eremenko V.A., Sandy M.P., Kosyreva M.A.
|
Vol 53, No 2 (2017) |
Experience of destressing slotting to prevent gas-dynamic events in mechanized carnallite mining |
 (Eng)
|
Nesterova S.Y.
|
Vol 53, No 2 (2017) |
Methodological basis for calculating parameters of direct dumping flowsheets in open pit mining of gently dipping coal beds |
 (Eng)
|
Reznik A.V., Cheskidov V.I., Bobyl’sky A.S.
|
Vol 53, No 2 (2017) |
Technology of dimension stone cutting |
 (Eng)
|
Ismanov M.M.
|
Vol 53, No 1 (2017) |
Improving Evaluation Methods for Production Capacity and Life of Open Pit Diamond Mines |
 (Eng)
|
Akishev A.N., Zyryanov I.V., Kornilkov S.V., Kantemirov V.D.
|
Vol 53, No 1 (2017) |
Technology of Backfill Preparation Based on Cement-and-Slag Binder in Orlov Mine |
 (Eng)
|
Krupnik L.A., Shaposhnik Y.N., Shaposhnik S.N., Nurshaiykova G.T., Tungushbaeva Z.K.
|
Vol 53, No 1 (2017) |
Robotic Geotechnologies as Way of Improving Efficiency and Ecologization of Mineral Resource Management |
 (Eng)
|
Ryl’nikova M.V., Vladimirov D.Y., Pytalev I.A., Popova T.M.
|
Vol 53, No 1 (2017) |
Structural Peculiarities of Coal Mine Waste Piles in Kuzbass |
 (Eng)
|
Prokopenko S.A., Ludzish V.S., Lesin Y.V., Tyulenev M.A., Sushko A.V.
|
Vol 53, No 1 (2017) |
Experience in the Adoption of Room & Pillar Mining Method in the Company OKD, a.s., Czech Republic |
 (Eng)
|
Hudeček V., Šancer J., Zubíček V., Golasowski J.
|
Vol 52, No 6 (2016) |
Determination of open pit diamond mine limits with regard to stripping time difference |
 (Eng)
|
Yakovlev V.L., Zyryanov I.V., Akishev A.N., Sakantsev G.G.
|
Vol 52, No 6 (2016) |
Technology of abandoned ore drawing using canopies |
 (Eng)
|
Golik V.I.
|
Vol 52, No 6 (2016) |
Optimal combination technology for high-grade quartz production based on modeling |
 (Eng)
|
Sokolov I.V., Smirnov A.A., Antipin Y.G., Baranovsky K.V., Rozhkov A.A.
|
Vol 52, No 5 (2016) |
Rockbolting improvement in Coal Mines in permafrost regions |
 (Eng)
|
Razumov E.A., Klishin V.I., Opruk G.Y., Grechishkin P.V.
|
Vol 52, No 5 (2016) |
Optimal extraction sequence modeling for open pit mining operation considering the dynamic cutoff grade |
 (Eng)
|
Moosavi E., Gholamnejad J.
|
51 - 75 of 90 Items |
<< < 1 2 3 4 > >>
|