| Issue | 
        Title | 
        File | 
		| Vol 55, No 6 (2019) | 
	Research and Development of Bio-Degasification Technologies for Coal Fields | 
	
									  (Eng)
						 | 
	| 
		Kurlenya M.V., Emel’yanova E.K., Andreeva I.S., Savchenko A.V.
	 | 
		| Vol 55, No 6 (2019) | 
	Optimizing Shearer Web Width in Underground Mining of Gently Dipping Methane-Bearing Coal Seams | 
	
									  (Eng)
						 | 
	| 
		Ordin A.A., Timoshenko A.M., Botvenko D.V.
	 | 
		| Vol 55, No 6 (2019) | 
	Improving the Construction of Mechanized Complexes for Reloading Points while Developing Deep Open Pits | 
	
									  (Eng)
						 | 
	| 
		Shustov O.O., Haddad J.S., Adamchuk A.A., Rastsvietaiev V.O., Cherniaiev O.V.
	 | 
		| Vol 55, No 5 (2019) | 
	Selecting Cyclical-and-Continuous Process Flow Diagrams for Deep Open Pit Mines | 
	
									  (Eng)
						 | 
	| 
		Yakovlev V.L., Bersenev V.A., Glebov A.V., Kulniyaz S.S., Marinin M.A.
	 | 
		| Vol 55, No 5 (2019) | 
	Production Scheduling with Horizontal Mixing Simulation in Block Cave Mining | 
	
									  (Eng)
						 | 
	| 
		Khodayari F., Pourrahimian Y., Liu W.V.
	 | 
		| Vol 55, No 4 (2019) | 
	Substantiation of Geotechnologies for Underground Ore Mining Based on the Model Representations of Change in the Natural Stress Field Parameters | 
	
									  (Eng)
						 | 
	| 
		Neverov A.A., Neverov S.A., Tapsiev A.P., Shchukin S.A., Vasichev S.Y.
	 | 
		| Vol 55, No 4 (2019) | 
	Technologies for Increasing Efficiency of Solid Mineral Mining with Hydraulic Fracturing | 
	
									  (Eng)
						 | 
	| 
		Serdyukov S.V., Patutin A.V., Shilova T.V., Azarov A.V., Rybalkin L.A.
	 | 
		| Vol 55, No 4 (2019) | 
	Impact of the Length of Manoeuvering Roads of a Bucket Wheel Excavator for Working Times in the Shortwall | 
	
									  (Eng)
						 | 
	| 
		Sowała M., Strempski A., Woźniak J., Pactwa K.
	 | 
		| Vol 55, No 4 (2019) | 
	Block Extraction of Himalayan Rock Salt by Applying Conventional Dimension Stone Quarrying Techniques | 
	
									  (Eng)
						 | 
	| 
		Majeed Y., Emad M.Z., Rehman G., Arshad M.
	 | 
		| Vol 55, No 3 (2019) | 
	Methodology for Creation and Application of Nature-Like Mining Technologies in Development of Mineral Resources in the Arctic | 
	
									  (Eng)
						 | 
	| 
		Trubetskoy K.N., Galchenko Y.P., Kalabin G.V.
	 | 
		| Vol 55, No 3 (2019) | 
	Coal Quality Control in Mining Complex-Structure Deposits | 
	
									  (Eng)
						 | 
	| 
		Khoyutanov E.A., Gavrilov V.L.
	 | 
		| Vol 55, No 3 (2019) | 
	Comparative Analysis of Water Inrush from the Deep Coal Floor by Mining above the Confined Aquifer | 
	
									  (Eng)
						 | 
	| 
		Yu H.T., Zhu S.Y., Chen Y.
	 | 
		| Vol 55, No 2 (2019) | 
	Features of Hydraulic Fill Formation in Mining Water-Bearing Lignite Deposit | 
	
									  (Eng)
						 | 
	| 
		Cheskidov V.I., Reznik A.V.
	 | 
		| Vol 55, No 2 (2019) | 
	Multi-Attribute Scenario Analysis of Protection of Drmno Open Pit Mine against Groundwater | 
	
									  (Eng)
						 | 
	| 
		Šubaranović T., Vujić S., Radosavljević M., Dimitrijević B., Ilić S., Krunić D.J.
	 | 
		| Vol 55, No 2 (2019) | 
	Modeling Top Coal Disintegration in Thick Seams in Longwall Top Coal Caving | 
	
									  (Eng)
						 | 
	| 
		Klishin V.I., Fryanov V.N., Pavlova L.D., Opruk G.Y.
	 | 
		| Vol 55, No 2 (2019) | 
	Integrated Use of Kuznetsk Coal in Multi-Stage Preparation for Combustion and Recovery of Waste | 
	
									  (Eng)
						 | 
	| 
		Anferov B.A., Kuznetsova L.V.
	 | 
		| Vol 55, No 2 (2019) | 
	Shuttle and Bench Flow Charts in Underground Mining of Thick Methane-Bearing Coal Seams | 
	
									  (Eng)
						 | 
	| 
		Ordin A.A., Timoshenko A.M., Bovenko D.V., Meshkov A.A., Volkov M.A.
	 | 
		| Vol 55, No 1 (2019) | 
	Development of a Match Factor and Comparison of Its Applicability with Ant-Colony Algorithm in a Heterogeneous Transportation Fleet in an Open-Pit Mine | 
	
									  (Eng)
						 | 
	| 
		Dabbagh A., Bagherpour R.
	 | 
		| Vol 55, No 1 (2019) | 
	Evaluation of Drum Shearer Capacity in Coal Seam with Variable Geomechanical and Geotechnical Characteristics | 
	
									  (Eng)
						 | 
	| 
		Ordin A.A., Okol’nishnikov V.V., Rudometov S.V., Metel’kov A.A.
	 | 
		| Vol 55, No 1 (2019) | 
	Backfilling Mixture Preparation Using Milled Granulated Blast-Furnace Slag | 
	
									  (Eng)
						 | 
	| 
		Krupnik L.A., Shaposhnik Y.N., Shaposhnik S.N., Nurshaiykova G.T.
	 | 
		| Vol 55, No 1 (2019) | 
	Geodynamic Hazard Assessment for Tectonic Structures in Underground Mining of North Ore Bodies in the Oktyabrsky Deposit | 
	
									  (Eng)
						 | 
	| 
		Uskov V.A., Eremenko A.A., Darbinyan T.P., Marysyuk V.P.
	 | 
		| Vol 55, No 1 (2019) | 
	Linear Model of Location Optimization of Limestone Exploitation and Consumption in Macedonia | 
	
									  (Eng)
						 | 
	| 
		Boševski T., Vujić S., Radosavljević M., Kuzmanović M.
	 | 
		| Vol 55, No 1 (2019) | 
	Open Pit Mining Technologies for Watered Lignite Deposits in the Kansk—Achinsk Basin | 
	
									  (Eng)
						 | 
	| 
		Reznik A.V., Cheskidov V.I.
	 | 
		| Vol 55, No 1 (2019) | 
	Structural Data Collection for Slope Stability Analysis Using Digital Technology—A Case Study of Melbur Pit, UK | 
	
									  (Eng)
						 | 
	| 
		Manda-Mvula E., Kaunda R.B.
	 | 
		| Vol 54, No 6 (2018) | 
	Solving Problems in Ore Mining and Processing Using Information Technologies | 
	
									  (Eng)
						 | 
	| 
		Gromov E.V., Biryukov V.V., Zotov A.M.
	 | 
	
		| 1 - 25 of 90 Items | 
		
		1 2 3 4 > >> 
				 |