Improving the Construction of Mechanized Complexes for Reloading Points while Developing Deep Open Pits
- 作者: Shustov O.O.1, Haddad J.S.2, Adamchuk A.A.1, Rastsvietaiev V.O.1, Cherniaiev O.V.1
-
隶属关系:
- Dnipro University of Technology
- Al-Balqa Applied University
- 期: 卷 55, 编号 6 (2019)
- 页面: 946-953
- 栏目: Mineral Mining Technology
- URL: https://journals.rcsi.science/1062-7391/article/view/184781
- DOI: https://doi.org/10.1134/S1062739119066332
- ID: 184781
如何引用文章
详细
Layouts of reloading points in the cyclical-and-continuous technology for deep-level surface mining are analyzed. The innovative structure of a reloading point involving dump trucks drivethrough passing has been proposed; the structure will make it possible to increase reloading point productivity, cut the costs for rock mass extraction, and reduce the time of motor transport maneuvering. Dependence of general funds saving for overburden rock extraction upon the open pit depth while constructing a reloading point with the drivethrough passing comparing to a dead-end unloading of various-capacity dump trucks has been determined.
作者简介
O. Shustov
Dnipro University of Technology
Email: drjamil@bau.edu.jo
乌克兰, Dnipro
J. Haddad
Al-Balqa Applied University
编辑信件的主要联系方式.
Email: drjamil@bau.edu.jo
约旦, Amman
A. Adamchuk
Dnipro University of Technology
Email: drjamil@bau.edu.jo
乌克兰, Dnipro
V. Rastsvietaiev
Dnipro University of Technology
Email: drjamil@bau.edu.jo
乌克兰, Dnipro
O. Cherniaiev
Dnipro University of Technology
Email: drjamil@bau.edu.jo
乌克兰, Dnipro
补充文件
