Experimental Study of Laterally Loaded Stub Abutment and Unburied Piles


Citar

Texto integral

Acesso aberto Acesso aberto
Acesso é fechado Acesso está concedido
Acesso é fechado Somente assinantes

Resumo

In the integral bridge, the deck contraction makes the abutment move away from backfill and causes a failure wedge. To inhibit the failure wedge, a new method with connector from each abutment to the unburied piles outside the bridge has been proposed. The soil behavior around laterally loaded stub abutment and unburied piles was studied on laboratory models using the PIV (particle image velocimetry) method. The effects of unburied pile number and soil − pile interaction on the soil deformation pattern were investigated.

Sobre autores

S. Khatibi

Department of Civil Engineering, University of Tabriz

Autor responsável pela correspondência
Email: saeedkhakikhatibi@yahoo.com
Irã, Tabriz

M. Barghian

Department of Civil Engineering, University of Tabriz

Email: saeedkhakikhatibi@yahoo.com
Irã, Tabriz

M. Hajialilue-Bonab

Department of Civil Engineering, University of Tabriz

Email: saeedkhakikhatibi@yahoo.com
Irã, Tabriz


Declaração de direitos autorais © Springer Science+Business Media, LLC, part of Springer Nature, 2019

Este site utiliza cookies

Ao continuar usando nosso site, você concorda com o procedimento de cookies que mantêm o site funcionando normalmente.

Informação sobre cookies