Experimental Study of Laterally Loaded Stub Abutment and Unburied Piles


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

In the integral bridge, the deck contraction makes the abutment move away from backfill and causes a failure wedge. To inhibit the failure wedge, a new method with connector from each abutment to the unburied piles outside the bridge has been proposed. The soil behavior around laterally loaded stub abutment and unburied piles was studied on laboratory models using the PIV (particle image velocimetry) method. The effects of unburied pile number and soil − pile interaction on the soil deformation pattern were investigated.

作者简介

S. Khatibi

Department of Civil Engineering, University of Tabriz

编辑信件的主要联系方式.
Email: saeedkhakikhatibi@yahoo.com
伊朗伊斯兰共和国, Tabriz

M. Barghian

Department of Civil Engineering, University of Tabriz

Email: saeedkhakikhatibi@yahoo.com
伊朗伊斯兰共和国, Tabriz

M. Hajialilue-Bonab

Department of Civil Engineering, University of Tabriz

Email: saeedkhakikhatibi@yahoo.com
伊朗伊斯兰共和国, Tabriz

补充文件

附件文件
动作
1. JATS XML

版权所有 © Springer Science+Business Media, LLC, part of Springer Nature, 2019