Reconstruction of the Arcelormittal Temirtau Metallurgical Combine Sinter Line of Sintering Machine AKM-312/336. Part 1


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

Results are given for the reconstruction and modernization of sintering machine AKM-312/336 No. 7 of ArcelorMittal Temirtau (formerly Karaganda Metallurgical Combine). The gas exhaust conduit of the sinter machine is reconstructed: the first stage of the gas cleaning system within the composition of the “dirty gas” collector, 28 TsN-15 cyclones and two scraper conveyers are dismantled, and the “semiclean gas” collector with 32 dust chambers and two gate valves have been replaced, beneath which a rubber conveyer has been installed. The following have been modernized: a charge drum-mixer, two charge drum pelletizers, a charge loading assembly for the sinter machine, an ignition hearth, and an assembly for charging sinter into a linear cooler. A planned number of multicyclones (from 780 to 960) of two battery cyclones is restored, and a “zero” vacuum chamber is installed beneath the ignition hearth. Stationary throttling devices are mounted within connections of the “zero” and first vacuum chambers. The first batch of massive self-cleaning grates is manufactured and tested instead of the existing light grate bars. As a result of reconstruction and modernization, the sinter machine operating area is increased from 336 to 348 m2, the charge layer from 380 to 450 mm, and sinter specific productivity is increased by ~40%; gas consumption is reduced by 70%, solid fuel consumption by 7% compared with other sinter machines.

作者简介

Yu. Frolov

Uralelektra Scientific and Production Enterprise; ArcellorMittal Temirtau Company

编辑信件的主要联系方式.
Email: uaf.39@mail.ru
俄罗斯联邦, Ekaterinburg; Temirtau

M. Vitushchenko

ArcellorMittal Temirtau Company

Email: uaf.39@mail.ru
哈萨克斯坦, Temirtau

补充文件

附件文件
动作
1. JATS XML

版权所有 © Springer Science+Business Media New York, 2017