Power Increase of Steelmaking Electric-Arc Furnace


Citar

Texto integral

Acesso aberto Acesso aberto
Acesso é fechado Acesso está concedido
Acesso é fechado Somente assinantes

Resumo

Different schemes for connecting a static thyristor compensator (STC) are examined. Research conducted using a simulation model in the Simulink app of the Matlab mathematical package for the DSP-250 and STK-330 MVAr complexes at the metallurgical enterprise MMK Metalurji (Dortyol, Turkey) is presented. Three STC connection schemes, differing from the classical schemes, are analyzed. For each variant, the operating regimes of the thyristor-reactor group (TRG) for which the maximum electric power increase in the working space of the SEAF obtains are determined. An operational algorithm was developed for automatic control of the TRG in order to maintain the normative reactive power factor.

Sobre autores

G. Kornilov

Magnitogorsk State Technical University

Autor responsável pela correspondência
Email: korn_mgn@mail.ru
Rússia, Magnitogorsk

A. Nikolaev

Magnitogorsk State Technical University

Email: korn_mgn@mail.ru
Rússia, Magnitogorsk

V. Anokhin

Magnitogorsk State Technical University

Email: korn_mgn@mail.ru
Rússia, Magnitogorsk

Arquivos suplementares

Arquivos suplementares
Ação
1. JATS XML

Declaração de direitos autorais © Springer Science+Business Media New York, 2016