Locomotive Assignment Graph Model for Freight Traffic on Linear Section of Railway. The Problem of Finding a Maximal Independent Schedule Coverage


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

The paper is devoted to the formal statement and solution of a problem arising when assigning the locomotives for freight transportation realization in accordance with preset schedule. The goal is to determine whether the number of locomotives is sufficient at a specified initial allocation of them to perform all transport operations. The solution is presented in the form of an algorithm that builds the coverage of the schedule: the complete one, if it exists, or else the partial one being the maximal independent. The theorem is proved on one-to-one correspondence between the existence of the complete coverage and the sufficiency of the number of locomotives.

作者简介

L. Zhilyakova

Trapeznikov Institute of Control Sciences

编辑信件的主要联系方式.
Email: zhilyakova.ludmila@gmail.com
俄罗斯联邦, Moscow

N. Kuznetsov

Kotel’nikov Institute of Radio Engineering and Electronics

编辑信件的主要联系方式.
Email: kuznetsov@cplire.ru
俄罗斯联邦, Moscow

V. Matiukhin

Research and Design Institute for Information Technology, Signalling and Telecommunications in Railway Transportation

编辑信件的主要联系方式.
Email: info@vniias.ru
俄罗斯联邦, Moscow

A. Shabunin

Research and Design Institute for Information Technology, Signalling and Telecommunications in Railway Transportation

编辑信件的主要联系方式.
Email: a.shabunin@vniias.ru
俄罗斯联邦, Moscow

A. Takmazian

JSC “ProgramPark,”

编辑信件的主要联系方式.
Email: takmazian@gmail.com
俄罗斯联邦, Moscow

补充文件

附件文件
动作
1. JATS XML

版权所有 © Pleiades Publishing, Inc., 2019