Locomotive Assignment Graph Model for Freight Traffic on Linear Section of Railway. The Problem of Finding a Maximal Independent Schedule Coverage


Cite item

Full Text

Open Access Open Access
Restricted Access Access granted
Restricted Access Subscription Access

Abstract

The paper is devoted to the formal statement and solution of a problem arising when assigning the locomotives for freight transportation realization in accordance with preset schedule. The goal is to determine whether the number of locomotives is sufficient at a specified initial allocation of them to perform all transport operations. The solution is presented in the form of an algorithm that builds the coverage of the schedule: the complete one, if it exists, or else the partial one being the maximal independent. The theorem is proved on one-to-one correspondence between the existence of the complete coverage and the sufficiency of the number of locomotives.

About the authors

L. Yu. Zhilyakova

Trapeznikov Institute of Control Sciences

Author for correspondence.
Email: zhilyakova.ludmila@gmail.com
Russian Federation, Moscow

N. A. Kuznetsov

Kotel’nikov Institute of Radio Engineering and Electronics

Author for correspondence.
Email: kuznetsov@cplire.ru
Russian Federation, Moscow

V. G. Matiukhin

Research and Design Institute for Information Technology, Signalling and Telecommunications in Railway Transportation

Author for correspondence.
Email: info@vniias.ru
Russian Federation, Moscow

A. B. Shabunin

Research and Design Institute for Information Technology, Signalling and Telecommunications in Railway Transportation

Author for correspondence.
Email: a.shabunin@vniias.ru
Russian Federation, Moscow

A. K. Takmazian

JSC “ProgramPark,”

Author for correspondence.
Email: takmazian@gmail.com
Russian Federation, Moscow

Supplementary files

Supplementary Files
Action
1. JATS XML

Copyright (c) 2019 Pleiades Publishing, Inc.