Study of the Operating Parameters of a Wind Power Plant with 0.75 MW Power under the Conditions of Tashkent Oblast


Citar

Texto integral

Acesso aberto Acesso aberto
Acesso é fechado Acesso está concedido
Acesso é fechado Somente assinantes

Resumo

Aspects of the use of the first experimental wind power plant with a capacity of 0.75 МW in the conditions of Tashkent oblast are considered. The results of monitoring of electric power development by the wind power plant for the months of 2017–2018 are presented. According to the monitoring data, the ratio of electric power production at the installation for the period from September 2017 to July 2018 was 714.9 МW h.

Sobre autores

S. Shoguchkarov

Tashkent State Technical University

Autor responsável pela correspondência
Email: sanjar4242@inbox.ru
Uzbequistão, Tashkent

T. Jamolov

Tashkent State Technical University

Email: sanjar4242@inbox.ru
Uzbequistão, Tashkent

N. Mukhtarov

Tashkent State Technical University

Email: sanjar4242@inbox.ru
Uzbequistão, Tashkent

I. Yuldoshev

Tashkent State Technical University

Email: sanjar4242@inbox.ru
Uzbequistão, Tashkent

Arquivos suplementares

Arquivos suplementares
Ação
1. JATS XML

Declaração de direitos autorais © Allerton Press, Inc., 2018