Study of the Operating Parameters of a Wind Power Plant with 0.75 MW Power under the Conditions of Tashkent Oblast


Дәйексөз келтіру

Толық мәтін

Ашық рұқсат Ашық рұқсат
Рұқсат жабық Рұқсат берілді
Рұқсат жабық Тек жазылушылар үшін

Аннотация

Aspects of the use of the first experimental wind power plant with a capacity of 0.75 МW in the conditions of Tashkent oblast are considered. The results of monitoring of electric power development by the wind power plant for the months of 2017–2018 are presented. According to the monitoring data, the ratio of electric power production at the installation for the period from September 2017 to July 2018 was 714.9 МW h.

Авторлар туралы

S. Shoguchkarov

Tashkent State Technical University

Хат алмасуға жауапты Автор.
Email: sanjar4242@inbox.ru
Өзбекстан, Tashkent

T. Jamolov

Tashkent State Technical University

Email: sanjar4242@inbox.ru
Өзбекстан, Tashkent

N. Mukhtarov

Tashkent State Technical University

Email: sanjar4242@inbox.ru
Өзбекстан, Tashkent

I. Yuldoshev

Tashkent State Technical University

Email: sanjar4242@inbox.ru
Өзбекстан, Tashkent

Қосымша файлдар

Қосымша файлдар
Әрекет
1. JATS XML

© Allerton Press, Inc., 2018