Construction of Complex Schedules for Execution of Task Packages at Forming Sets in Specified Directive Terms
- Authors: Krotov K.V1, Skatkov A.V1
-
Affiliations:
- Sebastopol State University
- Issue: Vol 20, No 3 (2021)
- Pages: 654-689
- Section: Mathematical modeling and applied mathematics
- URL: https://journals.rcsi.science/2713-3192/article/view/266317
- DOI: https://doi.org/10.15622/ia.2021.3.6
- ID: 266317
Cite item
Full Text
Abstract
About the authors
K. V Krotov
Sebastopol State University
Email: krotov_k1@mail.ru
Universitetskaya St. 33
A. V Skatkov
Sebastopol State University
Email: Vm1945@mail.ru
Universitetskaya St. 33
References
- Кротов К.В. Комплексный метод определения эффективных решений по составам партий данных и расписаниям их обработки в конвейерных системах // Журнал «Вычислительные технологии», Новосибирск, Изд-во Института вычислительных технологий СО РАН, № 3, 2018. С. 58-76.
- Mendez C.A. et al. State-of-the-art review of optimization methods for short-term scheduling of batch processes // Computers and Chemical Engineering, 2006, vol. 30, pp. 913–946.
- Adonyi R., Romero J., Puigjaner L., Friedler F. Incorporating heat integration in batch process scheduling // Applied Thermal Engineering, 2003, vol. 23, pp. 1743–1762.
- Agha M. Integrated management of energy and production: scheduling of batch process and Combined Heat & Power plant // University of Toulouse. National Polytechnic Institute of Toulouse (FRANCE), 2009.
- Zeballos L.J., Henning G.P. A CP approach to the scheduling of resource-constrained multiproduct continuous facilities // Latin American Applied Research, 2006, №36, pp. 205-212.
- Díaz-Ramírez J., Huertas J.I. A continuous time model for a short-term multiproduct batch process scheduling // Ingeniería e Investigación, 2018, vol. 38, №1, pp. 96-104. doi: 10.15446/ing.investig.v38n1.66425
- Ning Ch., You F. Batch Process Scheduling under Uncertainty using Data-Driven Multistage Adaptive Robust Optimization // Сhemical engineering transactions, 2017, vol. 61, pp. 1567-1572. doi: 10.3303/CET1761259
- Chaudhry I.A., Elbadawi I. A-Q., Usman M., Chugtai M. T. Minimising Total Flowtime in a No-Wait Flow Shop (NWFS) using Genetic Algorithms // Ingeniería e Investigación, 2018, vol. 38, № 3, pp. 68-79. doi: 10.15446/ing.investig.v38n3.75281
- Ogun B., Cigdem A.-U. Mathematical Models for a Batch Scheduling Problem to Minimizе Earliness and Tardiness // Journal of Industrial Engineering and Management. JIEM, 2018, № 11(3), pp. 390–405. doi: 10.3926/jiem.2541.
- Li X. L., Wang Y. Scheduling Batch Processing Machine Using Max–Min Ant System Algorithm Improved by a Local Search Method // Mathematical Problems in Engineering. 2018, vol. 2018, Article ID: 3124182, 10 pages. doi: 10.1155/2018/3124182.
- Tan Y., Huangi W., Sun Y., Yue Y. Comparative Study of Different Approaches to Solve Batch Process Sheduling and Optimisation Problems // Proceedings of the 18th International Conference on Automation & Computing. Loughborough University. Leicestershire. UK. 2012, pp. 424–444.
- Cheng B.-Y., Chen H.-P., Wang S.-S. Improved ant colony optimization method for single batch-processing machine with non-identical job sizes // Journal of System Simulation, 2009, vol. 21, № 9, pp. 2687–2695.
- Koehler F. Khuller S. Optimal Batch Schedules for Parrallel Machines // Algorithms and Data Structures: 13th International Symposium. Berlin: Springer, 2013, pp. 475–486.
- Monch L., Balasubramanian H., Fowler J. W., Pfund M. E. Heuristic scheduling of jobs on parallel batch machines with incompatible job families andunequal ready times // Computers & Operations Research, 2005, №32, pp. 2731–2750.
- Dang Th.-T., Frankovic B., Budinska I. Using heuristic search for solving single machine batch processing problems // Computing and Informatics, 2006, vol. 25, pp. 405–420.
- Kohn R., Rose O., Laroque Ch. Study on multi-objective optimization for parallel batch machine scheduling using variable neighbourhood search // Proceedings of the 2013 Winter Simulation Conference. 8th-11th December 2013, pp. 3654-3670.
- Li Sh., Cheng T.C.E., Ng C.T, Yuan J. Single-machine batch scheduling with job processing time compatibility // Theoretical Computer Science, 2015, vol. 583, pp. 57-66. doi: 10.1016/j.tcs.2015.03.043.
- Jin M., Liu X., Luo W. Single-Machine Parallel-Batch Scheduling with Nonidentical Job Sizes and Rejection // Mathematics, 2020, vol. 8, Article ID:258. doi: 10.3390/math8020258.
- Surjandari I., Rachman A., Purdianta, Dhini A. The batch scheduling model for dynamic multi-item, multi-level production in an assembly job shop with parallel machines // International Journal of Technology, 2015, №1, pp. 84-96. doi: 10.14716/ijtech.v6i1.783.
- Joglekar G. Using Simulation for Scheduling and Rescheduling of Batch Processes // Processes, 2017, # 5, Article ID 66. doi: 10.3390/pr5040066.
- Ковалев М.Я. Модели и методы календарного планирования. Курс лекций. Минск: БГУ. 2004. 63 с.
- Кротов К.В. Обоснование методов построения комплексных расписаний обработки партий данных при условии оперативного формировании комплектов из результатов // Вестник Воронежского Государственного Университета. Серия: Системный анализ и информационные технологии, №4, 2018, C. 58–72.
- Кротов К.В. Использование аппарата генетических алгоритмов при формировании решений по составам партий данных в двухуровневой задаче построения комплексных расписаний их обработки // Автоматизированные технологии и производства. Международный научно-технический журнал, 2017, №2(16). C. 23–34.
- Кротов К.В. Построение комплексных расписаний обработки пакетов данных в конвейерной системе при задании ограничений на длительность интервалов времени ее функционирования // Труды учебных заведений связи, 2020, т.6, №3. С. 75–89.
Supplementary files
