Methods of determining the volume of industrial jobs in the plan period
- 作者: Mordasov U.1
-
隶属关系:
- Moscow State University of Mechanical Engineering (MAMI)
- 期: 卷 9, 编号 2-5 (2015)
- 页面: 60-67
- 栏目: Articles
- URL: https://journals.rcsi.science/2074-0530/article/view/67030
- DOI: https://doi.org/10.17816/2074-0530-67030
- ID: 67030
如何引用文章
全文:
详细
The article developed a method of determining the volume of production tasks during the plan- ning period. The approbation of the model. For this purpose, a simulation model of production, ma- chine-building process taking into account the effect of random disturbances - failures. Comparison of the results of mathematical modeling and simulation proves the feasibility of a mathematicalmodel in practice.
作者简介
U. Mordasov
Moscow State University of Mechanical Engineering (MAMI)
Email: mordasov2001@mail.ru
Ph.D.; 8-916-853-13-32
参考
- Мордасов Ю.П., Анализ некоторых стохастических характеристик технологического процесса. В кн. Анализ и синтез экономических систем и имитационное моделирование. - М: МИУ им. С. Орджоникидзе, 1983.-С.75-77