Formation of an effective schedule of work during the construction of a monolithic reinforced concrete house
- Authors: Ryazantseva N.V.1, Zolotarev V.V.2
-
Affiliations:
- Saint Petersburg State University of Architecture and Civil Engineering (SPbGASU)
- Glavstroy-Regions
- Issue: Vol 19, No 10 (2024)
- Pages: 1676-1686
- Section: Technology and organization of construction. Economics and management in construction
- URL: https://journals.rcsi.science/1997-0935/article/view/276629
- ID: 276629
Cite item
Full Text
Abstract
Introduction. The existing principles of construction organization, based on early developments that do not take into account the current situation, to a large extent become an obstacle to the development of the construction industry. The current situation requires the introduction of new approaches in construction management, allowing to adapt to changing economic conditions, and contributing to a reduction in the duration of construction. The task of the study was to develop a project for the organization of work, which allows reducing the time for the construction of a monolithic floor from 14 to 6 working days. The scientific novelty of the work lies in the development of such combinations of various technological stages that made it possible to reduce the duration of construction without violating construction production technologies; to make decisions promptly in a specific situation and maintain full control over the consumption of building materials, possible losses and labour costs not aimed at fulfilling the main tasks, in order to improve the technical and economic indicators of construction.Materials and methods. Standard technological processes and regulatory documents were studied. It is revealed that the optimization of technological processes and the use of the principles of “lean construction” contributes to reducing labour costs and consumption of building materials, increasing productivity and improving quality; the development and implementation of technology depends on the final goal and task of the project, implies a sequence of decision-making.Results. In the course of the research, an algorithm for making specific decisions was developed. To achieve this goal, an analysis of the technology of monolithic housing construction was carried out, the moments that have a direct impact on increasing the duration of construction and possible losses were identified, and options for making changes that contribute to solving these problems were proposed.Conclusions. The proposed work organization system may have great potential in the future, despite its simplicity. The developed technical and technological solutions aimed at a lean attitude in production and organization of construction will greatly contribute to improving the competitiveness of construction companies, reducing the cost of production by reducing direct costs, increasing productivity and improving product quality. The stages of further implementation will be built entirely on the justification and development of a lean construction management model, and steps to implement this system, determining the area of responsibility of each participant.
About the authors
N. V. Ryazantseva
Saint Petersburg State University of Architecture and Civil Engineering (SPbGASU)
Email: nrozanceva@lan.spbgasu.ru
ORCID iD: 0009-0008-1341-4743
SPIN-code: 7138-7182
V. V. Zolotarev
Glavstroy-Regions
Email: zolotonn@mail.ru
References
- Вумек П.Д., Джонс Д.Т. Бережливое производство: как избавиться от потерь и добиться процветания вашей компании. 12-е изд. М. : Приоритет, 2021. 478 c.
- Womack J.P., Jones D.T. Lean Thinking: Banish Waste and Create Wealth in Your Corporation. Revised and Updated Hardcover. Free Press, 2003. 396 p.
- Тайити О. Производственная система Тойоты: уходя от массового производства. 3-е изд. М. : Институт комплексных стратегических исследований, 2008. 194 c.
- Taiichi Ohno. Taiichi Ohnos Workplace Management: Special 100th Birthday Edition. McGraw Hill, 2012. 208 p.
- Киселев И. У истоков Бережливого производства. 2011. URL: https://tobetter.ru/lean/u-istokov-berezhlivogo-proizvodstva/
- Arashpour M., Arashpour M. Analysis of workflow variability and its impacts on productivity and performance in construction of multistory buildings // Journal of Management in Engineering. 2015. Vol. 31. Issue 6. doi: 10.1061/(asce)me.1943-5479.0000363
- Лапидус А.А., Демидов Л.П. Исследование факторов, влияющих на показатель потенциала строительной площадки // Вестник МГСУ. 2014. № 4. С. 160–166.
- Асаул М.А., Рыбнов Е.И. Формирование интегрированных структур для реализации инвестиционно-строительных проектов // Вестник гражданских инженеров. 2008. № 3 (16). С. 97–101. EDN JVRZAR.
- Болотин С.А., Биче-оол Х.В., Бохан Х.А., Хурейни Н.К.Р. Прикладные аспекты энтропийного показателя оценки актуального графика строительства // Вестник гражданских инженеров. 2022. № 4 (93). С. 65–72. doi: 10.23968/1999-5571-2022-19-4-65-72. EDN XVUERA.
- Sacks R. What constitutes good production flow in construction? // Construction Management and Economics. 2016. Vol. 34. Issue 9. Pp. 641–656. doi: 10.1080/01446193.2016.1200733
- Лапидус А.А. Потенциал эффективности организационно-технологических решений строительного объекта // Вестник МГСУ. 2014. № 1. С. 175–180.
- Лапидус А.А., Степанов А.Е. Формирование организационно-технологических параметров эффективности возведения монолитных конструкций многоэтажных жилых зданий // Наука и бизнес: пути развития. 2019. № 2 (92). С. 128–131. EDN YYTCYX.
- Степанов А.Е. Поточный метод организации работ при устройстве монолитных конструкций жилых зданий // Наука и бизнес: пути развития. 2019. № 5 (95). С. 172–173. EDN MJZYMG.
- Liliana L. A new model of Ishikawa diagram for quality assessment // IOP Conference Series: Materials Science and Engineering. 2016. Vol. 161. P. 012099. doi: 10.1088/1757-899X/161/1/012099
- Linnik M., Berghede K. An experiment in takt time planning applied to non-repetitive work // 21st Annual Conference of the International Group for Lean Construction. 2013.
- Болотин С.А., Аль-Жанаби М.А., Бохан Х.А. Прогнозирование окончания строительства на основе моделирования нелинейной зависимости от задержек отдельных работ // Вестник гражданских инженеров. 2022. № 2 (91). С. 83–90. doi: 10.23968/1999-5571-2022-19-2-83-90. EDN OGVLBZ.
- Болотин С.А., Бохан Х.А. Нейтрализация задержек работ на основе анализа графиков строительства, сформированных методом неопределенных ресурсных коэффициентов // Вестник гражданских инженеров. 2022. № 1 (90). С. 48–54. doi: 10.23968/1999-5571-2022-19-1-48-54. EDN QINEIU.
- Юдина А.Ф., Григорьев С.Ю., Величкин В.З. Использование BIM-технологий для контроля качества проектов строительной инфраструктуры // Вестник гражданских инженеров. 2020. № 2 (79). С. 132–137. doi: 10.23968/1999-5571-2020-17-2-132-137. EDN NLIPBT.
- Murguia D., Rathnayake A., Middleton C. Master schedule optimisation with the use of flowlines and performance data // Annual Conference of the International Group for Lean Construction. 2023. Pp. 1463–1474. doi: 10.24928/2023/0121
- Rathnayake A., Murguia D., Middleton C. Analysing the impact of construction flow on productivity // Annual Conference of the International Group for Lean Construction. 2023. doi: 10.24928/2023/0172
- Tommelein I.D., Singh V.V., Coelho R.V., Lehtovaara J. So Many Flows! // Annual Conference of the International Group for Lean Construction. 2022. Pp. 878–889. doi: 10.24928/2022/0199
- Муря В.А., Лапидус А.А. Влияние комплексного показателя качества организационно-технологических решений на конструктивные элементы многоэтажных железобетонных зданий // Перспективы науки. 2018. № 9 (108). С. 27–30. EDN YIZQSD.
- Петрова Т.М., Смирнова О.М. Бетоны с повышенной ранней прочностью на основе портландцементов ПЦ500-Д0-Н и ЦЕМ 1 42,5Н // Вестник гражданских инженеров. 2011. № 4 (29). С. 91–96. EDN OPBYMD.
- Лапидус А.А. Формирование интегрального потенциала организационно-технологических решений посредством декомпозиции основных элементов строительного проекта // Вестник МГСУ. 2016. № 12. С. 114–123. doi: 10.22227/1997-0935.2016.12.114-123
- Белова Н.Е., Долгов А.А., Петров А.А., Токунова Г.Ф., Харитонович А.В. Современные проблемы управления региональным инвестиционно-строительным комплексом. СПб. : СПбГАСУ, 2013. 144 с. EDN TXYNMX.
Supplementary files