Justification of the parameters of regulationof forces for steel-reinforced concrete span structures from project “43282 km” by TSNIIPSK
- Authors: Belutsky I.Y.1, Kudryavtsev S.A.2, Lazarev I.V.1
-
Affiliations:
- Pacific National University
- Far Eastern State Transport University
- Issue: Vol 18, No 5 (2022)
- Pages: 407-416
- Section: Analysis and design of building structures
- URL: https://journals.rcsi.science/1815-5235/article/view/325758
- DOI: https://doi.org/10.22363/1815-5235-2022-18-5-407-416
- ID: 325758
Cite item
Full Text
Abstract
Steel-reinforced concrete spans in road bridges have been widely used since the late 1950s, in the configuration of large-span bridges built across significant water barriers. To date, the issue of the need to reconstruct such span structures, including those designed and built according to the project “43282 km” developed by TsNIIPSK, is becoming increasingly relevant. The authors analyze the stages of the production of works of a particular object, developed for the implementation of the entire complex of works on its reconstruction using the method of force regulation. The presented order of work was successfully implemented during construction of the bridge over Kabarga River in Primorsky Krai. This made it possible to preserve the existing structure of the span (main beams and braces), replacing the worn-out reinforced concrete slab with a new - metal orthotropic one, while ensuring that the conditions of strength and stability of the flexural-torsional shape of solid-walled beams are met, in the process of dismantling the existing roadway slab and constructing a new one. Considering that steel-reinforced concrete bridges are built across large water barriers and have a very significant cost due to their large length, reconstruction using existing supports can significantly reduce the cost of construction, so, the possibility of upgrading the existing steel-reinforced concrete span structure is, undoubtedly, relevant. Based on the structural and technological measures presented by the authors, it is possible to carry out and effectively implement work on the reconstruction of the existing steel-reinforced concrete bridges that do not fully meet modern requirements for load capacity and throughput.
About the authors
Igor Y. Belutsky
Pacific National University
Email: mosttogu@mail.ru
ORCID iD: 0000-0002-3881-2050
Doctor of Technical Sciences, Professor of the Department of Highways, Institute of Civil Engineering
136 Tikhookeanskaya St, Khabarovsk, 680035, Russian FederationSergey A. Kudryavtsev
Far Eastern State Transport University
Email: mosttogu@mail.ru
ORCID iD: 0000-0001-5414-7567
Doctor of Technical Sciences, Professor, Head of the Department of Bridges, Tunnels and Under-Ground Structures, Institute of Transport Construction
47 Serysheva St, Khabarovsk, 680021, Russian FederationIgor V. Lazarev
Pacific National University
Author for correspondence.
Email: lazarev_igor_v@mail.ru
ORCID iD: 0000-0002-4677-7478
Candidate of Technical Sciences, Associate Professor of the Department of Highways, Institute of Civil Engineering
136 Tikhookeanskaya St, Khabarovsk, 680035, Russian FederationReferences
- Streletsky N.N. Steel-reinforced concrete bridge spans. 2nd ed., reprint. and add. Moscow: Transport Publ.; 1981. p. 25-82. (In Russ.)
- Gitman E.M. Rational methods of regulation and prestressing of continuous steel-reinforced concrete superstructures using high-strength reinforcement. Studies of Steel and Steel-Reinforced Concrete Bridges. Moscow: Transport Publ.; 1973. p. 45-60. (In Russ.)
- Gitman E.M. Regulation of continuous steel-reinforced concrete span structures and their prestressing without the use of high-strength reinforcement. Constructions, Calculation and Manufacturing Technology of Steel Bridges. Moscow: Transport Publ.; 1974. p. 41-51. (In Russ.)
- Tolmachev K.H. Force regulation in metal superstructures of road bridges (abstract of the dissertation of Doctor of Technical Sciences). Moscow; 1975. (In Russ.)
- Kartopoltsev V.M., Borovikov A.G., Borisenko A.V. Features of the installation of the span structure of the bridge over the Katun River in the village of Askat. Vestnik of Tomsk State University of Architecture and Building. 2004;(1):179-185. (In Russ.)
- Belutskiy I.U., Lazarev I.V., Lapin A.V. The practice of renovating of composite reinforced concrete bridges on restoring their consumer properties. Advanced Science and Technology for highways. 2022;(2):28-34. (In Russ.)
- Belutskiy I.U., Yarmolinskiy A.I., Zhao J., Lazarev I.V. Experience of reconstruction of composite bridges. Advanced Science and Technology for highways. 2016;(3):16-20. (In Russ.)
- Belutsky I.Yu., Lazarev I.V. Improving of special auxiliary structures, devices and technologies associated with reconstruction of steel-reinforced concrete bridges over watercourses. Scientific Works of the Kuban State Technological University. 2022;(1):1-12. (In Russ.)
- Belutsky I.Yu., Zhao J. Structural and layout solutions and modeling of the interface elements of temperature-continuous steel-reinforced concrete span structures. Khabarovsk: Pacific State University Publ.; 2015. (In Russ.)
Supplementary files