Solutions’ Integer Optimization for Tasks Inclusion in Packages and Package Execution Orders in the Flow Shop System Under Restrictions on the Availability of Devices with a Given Frequency
- Authors: Krotov K.V.1
-
Affiliations:
- Sevastopol State University
- Issue: Vol 11, No 6 (2025)
- Pages: 7-24
- Section: COMPUTER SCIENCE AND INFORMATICS
- URL: https://journals.rcsi.science/1813-324X/article/view/367936
- DOI: https://doi.org/10.31854/1813-324X-2025-11-6-7-24
- EDN: https://elibrary.ru/AOXJEV
- ID: 367936
Cite item
Full Text
Abstract
About the authors
K. V. Krotov
Sevastopol State University
Email: krotov_k1@mail.ru
ORCID iD: 0000-0002-9670-6141
SPIN-code: 9715-5051
References
- Кротов К.В. Модели смешанного целочисленного линейного программирования оптимизации включения заданий в пакеты и порядков проведения операций с ними в конвейерных системах // Информационно-управляющие системы. 2024. № 6. С. 46–57. doi: 10.31799/1684-8853-2024-6-46-57. EDN:EFCACX
- Aghezzaf E.-H., Khatab A., Tam P.L. Optimizing production and imperfect preventive maintenance planning's integration in failure-prone manufacturing systems // Reliability Engineering and System Safety. 2016. Vol. 145. PP. 190–198. doi: 10.1016/j.ress.2015.09.017. EDN:VENHRR
- Tam P.L., Aghezzaf E.-H., Khatab A., Le C.H. Integrated Production and Imperfect Preventive Maintenance Planning An Effective MILP-based Relax-and-Fix/Fix-and-Optimize Method // Proceedings of the 6th International Conference on Operations Research and Enterprise Systems (ICORES 2017, Porto, Portugal, 23–25 February 2017). 2017. Vol. 1. PP. 483–490 doi: 10.5220/0006285504830490
- Shehni A.A., Cheaitou A., Alsyouf I. Integrated Production and Maintenance Planning: A Comparison Between Block Policies // Proceedings of the 10th International Conference on Industrial Engineering and Operations Management (Dubai, UAE, 10–12 March 2020). PP. 1765–1773. URL: https://www.ieomsociety.org/ieom2020/papers/300.pdf (Accessed 08.12.2025)
- Moghaddam K.S. A Multi-Objective Modeling Approach for Integrated Manufacturing and Preventive Maintenance Planning // Operations and Supply Chain Management. 2021. Vol. 14. Iss. 1. PP. 83–99. doi: 10.31387/oscm0440288
- Hosseini S.M.H. Modeling the hybrid flow shop scheduling problem followed by an assembly stage considering aging effects and preventive maintenance activities // International Journal of Supply and Operations Management. 2016. Vol. 3. Iss. 1. PP. 1215–1233.
- Chansombat S., Pongcharoen P., Hicks C. A mixed-integer linear programming model for integrated production and preventive maintenance scheduling in the capital goods industry // International Journal of Production Research. 2019. Vol. 57. Iss. 1. PP. 61–82. doi: 10.1080/00207543.2018.1459923
- Boufellouh R., Belkaid F. Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: Application to the permutation flow shop problem // Computers and Operations Research. 2020. Vol. 122(3). P. 104943. doi: 10.1016/j.cor.2020.104943. EDN:TFBTAM
- Al-Shayea A., Fararah E., Nasr E.A., Mahmoud H.A. Model for Integrating Production Scheduling and Maintenance Planning of Flow Shop Production System // IEEE Access. 2020. Vol. 8. 2020. PP. 208826–208834. doi: 10.1109/ACCESS.2020.3038719. EDN:WKJARC
- Fattahi P., Fazlollahtabar H. A Joint Optimization Model for Production Scheduling and Preventive Maintenance Interval // International Journal of Engineering. Transactions B: Applications. 2021. Vol. 34. Iss. 11. PP. 2508–2516.
- Forghani A., Lotfi M.M., Ranjbar M., Sadegheih A. Hierarchical framework for maintenance and production scheduling of continuous ball mills in tile industries under TOU electricity pricing // Journal of Cleaner Production. 2021. Vol. 327. P. 129440. doi: 10.1016/j.jclepro.2021.129440. EDN:RMVTBA
- Chen Y., Guan Z., Wang Ch., Chou F.-D., Yue L. Bi-objective optimization of identical parallel machine scheduling with flexible maintenance and job release times // International Journal of Industrial Engineering Computations. 2022. Vol. 13. PP. 457–472. doi: 10.5267/j.ijiec.2022.8.003. EDN:XQSOFO
- Kumar T.J., Thangaraj M. An ordered precedence constrained flow shop scheduling problem with machine specific preventive maintenance // Journal of Project Management. 2023. Vol. 8. PP. 45–56. doi: 10.5267/j.jpm.2022.8.002. EDN:GGFBCY
- Esfeh M. K., Shojaei A.A., Javanshir H., Damghani K.К. Solving a bi-objective flexible flow shop problem with transporter preventive maintenance planning and limited buffers by NSGA-II and MOPSO // International Journal of Nonlinear Analysis and Applications. 2022. Vol. 31. Iss. 1. PP. 217–246. doi: 10.22075/ijnaa.2021.24335.2719
- Lunardi W.T., Cherri L.H., Voos H. A Mathematical Model and a Firefly Algorithm for an Extended Flexible Job Shop Problem with Availability Constraints // Proceedings of the 17th International Conference Artificial Intelligence and Soft Computing (ICAISC 2018, Zakopane, Poland, 3–7 June 2018). Lecture Notes in Computer Science. Cham: Springer, 2018. Vol. 10841. PP. 548–560. doi: 10.1007/978-3-319-91253-0_51
- Labidi M., Kooli A., Ladhari T., Gharbi A., Suryahatmaja U.S. A Computational Study of the Two-Machine No-Wait Flow Shop Scheduling Problem Subject to Unequal Release Dates and Non-Availability Constraints // IEEE Access. 2018. Vol. 6. PP. 16294–16304. doi: 10.1109/ACCESS.2018.2815598. EDN:YHVJLF
- Barjouei A.S., Barabadi A., Tavakkoli-Moghaddam R. Non-Preemptive Open Shop Scheduling Considering Machine Availability // Proceedings of International Conference on Industrial Engineering and Engineering Management (IEEM, Macao, China, 15–18 December 2019). IEEE, 2019. PP. 1280–1284. doi: 10.1109/IEEM44572.2019.8978648
- Lunardi W.T., Birgin E.G., Laborie Ph., Ronconi D.P., Voos H. Mixed Integer linear programming and constraint programming models for the online printing shop scheduling problem // Computers & Operations Research. 2020. Vol. 123. P. 105020. doi: 10.1016/j.cor.2020.105020. EDN:WXRELS
- Gencsi M. Metaheuristic Algorithms for Related Parallel Machines Scheduling Problem with Availability and Periodical Unavailability Constraints // Acta Polytechnica Hungarica. 2024. Vol. 21. Iss. 2. PP.89–110. doi: 10.12700/aph.21.2.2024.2.5. EDN:SESBKT
- Aggoune R., Deleplanque S. Addressing Machine Unavailability in Job Shop Scheduling: A Quantum Computing Approach // In: Sevaux M., Olteanu A.L., Pardo E.G., Sifaleras A., Makboul S. (eds) Metaheuristics. Proceedings of the15th International Conference (MIC 2024, Lorient, France, 4–7 June 2024). Lecture Notes in Computer Science. Cham: Springer, 2024. Vol. 14753. PP. 234–245. doi: 10.1007/978-3-031-62912-9_23
- Williams H.P. Model Building in Mathematical Programming. John Wiley & Sons, 2013. 432 p.
- Asghari M., Fathollahi-Fard A.M., Mirzapour Al-e-Hashem S.M.J., Dulebenets M.A. Transformation and Linearization Techniques in Optimization: A State-of-the-Art Survey // Mathematics. 2022. Vol. 10. Iss. 2. P. 283 doi: 10.3390/math10020283. EDN:ABRVQM
Supplementary files

