Transformation of the Kuban’ River Zelenchuk HPP into an HPP-PSPP


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

Various aspects are examined of the design to convert the Zelenchuk Hydroelectric Power Plant (HPP) into a Hydroelectric Power Plant and PSPP (HPP-PSPP). The most challenging engineering and technical issues are explored concerning the integration of new hydropower equipment in the powerhouse, and construction of a PSPP lower reservoir and tail pond conduits.

作者简介

R. Ikhsanov

JSC “Mosoblgidroproekt”

编辑信件的主要联系方式.
Email: IhshanovRM@hydroproject.com
俄罗斯联邦, Moscow

A. Baranov

JSC “Mosoblgidroproekt”

Email: IhshanovRM@hydroproject.com
俄罗斯联邦, Moscow

S. Kozlov

JSC “Mosoblgidroproekt”

Email: IhshanovRM@hydroproject.com
俄罗斯联邦, Moscow

S. Chernyshev

JSC “Mosoblgidroproekt”

Email: IhshanovRM@hydroproject.com
俄罗斯联邦, Moscow


版权所有 © Springer Science+Business Media New York, 2016
##common.cookie##