Transformation of the Kuban’ River Zelenchuk HPP into an HPP-PSPP
- 作者: Ikhsanov R.1, Baranov A.1, Kozlov S.1, Chernyshev S.1
-
隶属关系:
- JSC “Mosoblgidroproekt”
- 期: 卷 49, 编号 6 (2016)
- 页面: 397-401
- 栏目: Hydrotechnical Construction
- URL: https://journals.rcsi.science/1570-145X/article/view/244988
- DOI: https://doi.org/10.1007/s10749-016-0636-4
- ID: 244988
如何引用文章
详细
Various aspects are examined of the design to convert the Zelenchuk Hydroelectric Power Plant (HPP) into a Hydroelectric Power Plant and PSPP (HPP-PSPP). The most challenging engineering and technical issues are explored concerning the integration of new hydropower equipment in the powerhouse, and construction of a PSPP lower reservoir and tail pond conduits.
作者简介
R. Ikhsanov
JSC “Mosoblgidroproekt”
编辑信件的主要联系方式.
Email: IhshanovRM@hydroproject.com
俄罗斯联邦, Moscow
A. Baranov
JSC “Mosoblgidroproekt”
Email: IhshanovRM@hydroproject.com
俄罗斯联邦, Moscow
S. Kozlov
JSC “Mosoblgidroproekt”
Email: IhshanovRM@hydroproject.com
俄罗斯联邦, Moscow
S. Chernyshev
JSC “Mosoblgidroproekt”
Email: IhshanovRM@hydroproject.com
俄罗斯联邦, Moscow