Transformation of the Kuban’ River Zelenchuk HPP into an HPP-PSPP
- Autores: Ikhsanov R.1, Baranov A.1, Kozlov S.1, Chernyshev S.1
-
Afiliações:
- JSC “Mosoblgidroproekt”
- Edição: Volume 49, Nº 6 (2016)
- Páginas: 397-401
- Seção: Hydrotechnical Construction
- URL: https://journals.rcsi.science/1570-145X/article/view/244988
- DOI: https://doi.org/10.1007/s10749-016-0636-4
- ID: 244988
Citar
Resumo
Various aspects are examined of the design to convert the Zelenchuk Hydroelectric Power Plant (HPP) into a Hydroelectric Power Plant and PSPP (HPP-PSPP). The most challenging engineering and technical issues are explored concerning the integration of new hydropower equipment in the powerhouse, and construction of a PSPP lower reservoir and tail pond conduits.
Palavras-chave
Sobre autores
R. Ikhsanov
JSC “Mosoblgidroproekt”
Autor responsável pela correspondência
Email: IhshanovRM@hydroproject.com
Rússia, Moscow
A. Baranov
JSC “Mosoblgidroproekt”
Email: IhshanovRM@hydroproject.com
Rússia, Moscow
S. Kozlov
JSC “Mosoblgidroproekt”
Email: IhshanovRM@hydroproject.com
Rússia, Moscow
S. Chernyshev
JSC “Mosoblgidroproekt”
Email: IhshanovRM@hydroproject.com
Rússia, Moscow