Use of TCSR with Split Windings for Shortening the Spar Cycle Time in 500 kV Lines
- Autores: Matinyan A.M.1, Peshkov M.V.1, Karpov V.N.1, Alekseev N.A.1
-
Afiliações:
- JSC “R&D Center at Federal Grid Company of Unified Power System,”
- Edição: Volume 50, Nº 5 (2017)
- Páginas: 560-566
- Seção: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/245459
- DOI: https://doi.org/10.1007/s10749-017-0751-x
- ID: 245459
Citar
Resumo
The arc-fault recharge phenomenon in single-phase automatic reclosure (SPAR) of a line is examined. Abrief description is given of the design of a 500 kV thyristor controlled shunt reactor (TCSR) with split valve-side windings. This type of TCSR is shown to effectively quench a single-phase arc fault in a power transmission line and shortens the SPAR cycle time.
Sobre autores
A. Matinyan
JSC “R&D Center at Federal Grid Company of Unified Power System,”
Autor responsável pela correspondência
Email: al-drm@mail.ru
Rússia, Moscow
M. Peshkov
JSC “R&D Center at Federal Grid Company of Unified Power System,”
Email: al-drm@mail.ru
Rússia, Moscow
V. Karpov
JSC “R&D Center at Federal Grid Company of Unified Power System,”
Email: al-drm@mail.ru
Rússia, Moscow
N. Alekseev
JSC “R&D Center at Federal Grid Company of Unified Power System,”
Email: al-drm@mail.ru
Rússia, Moscow
Arquivos suplementares