Modeling the Control Systems of Gas-Turbines to Ensure Their Reliable Parallel Operation in the UPS of Russia
- Autores: Vinogradov A.1, Gerasimov A.1, Kozlov A.1, Smirnov A.1
-
Afiliações:
- JSC “STC UPS”
- Edição: Volume 50, Nº 1 (2016)
- Páginas: 98-103
- Seção: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/245099
- DOI: https://doi.org/10.1007/s10749-016-0667-x
- ID: 245099
Citar
Resumo
Consideration is given to different approaches to modeling the control systems of gas turbines as a component of CCPP and GTPP to ensure their reliable parallel operation in the UPS of Russia. The disadvantages of the approaches to the modeling of combined-cycle units in studying long-term electromechanical transients accompanied by power imbalance are pointed out. Examples are presented to support the use of more detailed models of gas turbines in electromechanical transient calculations. It is shown that the modern speed control systems of gas turbines in combination with relatively low equivalent inertia have a considerable effect on electromechanical transients, including those caused by disturbances not related to power imbalance.
Sobre autores
A. Vinogradov
JSC “STC UPS”
Autor responsável pela correspondência
Email: vinogradov_a@ntcees.ru
Rússia, St. Petersburg
A. Gerasimov
JSC “STC UPS”
Email: vinogradov_a@ntcees.ru
Rússia, St. Petersburg
A. Kozlov
JSC “STC UPS”
Email: vinogradov_a@ntcees.ru
Rússia, St. Petersburg
A. Smirnov
JSC “STC UPS”
Email: vinogradov_a@ntcees.ru
Rússia, St. Petersburg