Improving the Investment Potential of the Evenkiiskaya HPP When Working Jointly with HPPS of the Volga – Kama Cascade
- Авторлар: Aleksandrovskii A.Y.1, Soldatkin A.Y.1, Volkov D.M.1
-
Мекемелер:
- National Research University “MPÉI”
- Шығарылым: Том 50, № 3 (2016)
- Беттер: 235-239
- Бөлім: Hydrotechnical Construction
- URL: https://journals.rcsi.science/1570-145X/article/view/245184
- DOI: https://doi.org/10.1007/s10749-016-0689-4
- ID: 245184
Дәйексөз келтіру
Аннотация
The capability is studied of improving the investment potential of the Evenkiiskaya HPP by using the power it generates in the United Power System of the European part of Russia by transitioning to a compensated electrical regime of water reservoir resource usage. A quantitative assessment of Evenkiiskaya HPP usage is presented using daily load demand. Increasing the guaranteed HPP power is proposed as an alternative to new nuclear power stations.
Авторлар туралы
A. Aleksandrovskii
National Research University “MPÉI”
Хат алмасуға жауапты Автор.
Email: ayaleksand@mail.ru
Ресей, Moscow
A. Soldatkin
National Research University “MPÉI”
Email: ayaleksand@mail.ru
Ресей, Moscow
D. Volkov
National Research University “MPÉI”
Email: ayaleksand@mail.ru
Ресей, Moscow
Қосымша файлдар