Technical and Economical Feasibility of Putting the Steam Turbine of PGU-450 into Motoring Mode


Cite item

Full Text

Open Access Open Access
Restricted Access Access granted
Restricted Access Subscription Access

Abstract

Technical and economical feasibility of using the motoring mode of the steam turbine of PGU-450 CCPP to reserve its capacity as an alternative to turbine shutdown is analyzed. It is shown that putting the steam turbine to motoring mode and shutting down the gas turbines and heat-recovery steam generators to reserve the capacity of PGU-450 for 7 – 8 h is more economic than shutting down the steam turbine. In this case, the duration of the start-ups of PGU-450 is 35 – 40 min rather than 80 – 90 min.

About the authors

É. K. Arakelyan

National Research Uninersity “Moscow Power Engineering Institute”

Author for correspondence.
Email: Edik_arakelyan@inbox.ru
Russian Federation, Moscow

A. V. Andryushin

National Research Uninersity “Moscow Power Engineering Institute”

Email: Edik_arakelyan@inbox.ru
Russian Federation, Moscow

S. Yu. Burtsev

National Research Uninersity “Moscow Power Engineering Institute”

Email: Edik_arakelyan@inbox.ru
Russian Federation, Moscow

K. A. Andryushin

National Research Uninersity “Moscow Power Engineering Institute”

Email: Edik_arakelyan@inbox.ru
Russian Federation, Moscow


Copyright (c) 2017 Springer Science+Business Media, LLC

This website uses cookies

You consent to our cookies if you continue to use our website.

About Cookies