Technical and Economical Feasibility of Putting the Steam Turbine of PGU-450 into Motoring Mode
- Authors: Arakelyan É.K.1, Andryushin A.V.1, Burtsev S.Y.1, Andryushin K.A.1
-
Affiliations:
- National Research Uninersity “Moscow Power Engineering Institute”
- Issue: Vol 51, No 4 (2017)
- Pages: 451-453
- Section: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/245881
- DOI: https://doi.org/10.1007/s10749-017-0854-4
- ID: 245881
Cite item
Abstract
Technical and economical feasibility of using the motoring mode of the steam turbine of PGU-450 CCPP to reserve its capacity as an alternative to turbine shutdown is analyzed. It is shown that putting the steam turbine to motoring mode and shutting down the gas turbines and heat-recovery steam generators to reserve the capacity of PGU-450 for 7 – 8 h is more economic than shutting down the steam turbine. In this case, the duration of the start-ups of PGU-450 is 35 – 40 min rather than 80 – 90 min.
About the authors
É. K. Arakelyan
National Research Uninersity “Moscow Power Engineering Institute”
Author for correspondence.
Email: Edik_arakelyan@inbox.ru
Russian Federation, Moscow
A. V. Andryushin
National Research Uninersity “Moscow Power Engineering Institute”
Email: Edik_arakelyan@inbox.ru
Russian Federation, Moscow
S. Yu. Burtsev
National Research Uninersity “Moscow Power Engineering Institute”
Email: Edik_arakelyan@inbox.ru
Russian Federation, Moscow
K. A. Andryushin
National Research Uninersity “Moscow Power Engineering Institute”
Email: Edik_arakelyan@inbox.ru
Russian Federation, Moscow