Stability of Natural Circulation in a Vertical Boiler-Utilizer Loop with Horizontal Evaporator Pipes During Startup
- Authors: Pleshanov K.A.1,2, Sterkhov K.V.1, Roslyakov P.V.2
-
Affiliations:
- JSC Machine-Building Factory of Podolsk (ZIO)
- National Research University “Moscow Power Engineering Institute”
- Issue: Vol 50, No 4 (2016)
- Pages: 407-412
- Section: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/245324
- DOI: https://doi.org/10.1007/s10749-016-0722-7
- ID: 245324
Cite item
Abstract
Theoretical studies and field tests of the stability of natural circulation in the pipes of the horizontal evaporator of the PK-55 boiler-utilizer at the South-west Heat and Electric Power Plant (Yugo-zapadnaya TÉTs) are discussed. The experiments cover the stages of evaporator heating, onset of steam production, and stable natural circulation. During these studies the gas turbine was started and then held at a load of 5 MW. It is concluded that the evaporator with horizontal boiler-utilizer piping built for operation with repeated forced circulation can operate reliably for long periods in a natural circulation regime.
About the authors
K. A. Pleshanov
JSC Machine-Building Factory of Podolsk (ZIO); National Research University “Moscow Power Engineering Institute”
Email: sterkhovkv@gmail.com
Russian Federation, Podolsk, Moscow oblast’; Moscow
K. V. Sterkhov
JSC Machine-Building Factory of Podolsk (ZIO)
Author for correspondence.
Email: sterkhovkv@gmail.com
Russian Federation, Podolsk, Moscow oblast’
P. V. Roslyakov
National Research University “Moscow Power Engineering Institute”
Email: sterkhovkv@gmail.com
Russian Federation, Moscow