Stability of Natural Circulation in a Vertical Boiler-Utilizer Loop with Horizontal Evaporator Pipes During Startup


Cite item

Full Text

Open Access Open Access
Restricted Access Access granted
Restricted Access Subscription Access

Abstract

Theoretical studies and field tests of the stability of natural circulation in the pipes of the horizontal evaporator of the PK-55 boiler-utilizer at the South-west Heat and Electric Power Plant (Yugo-zapadnaya TÉTs) are discussed. The experiments cover the stages of evaporator heating, onset of steam production, and stable natural circulation. During these studies the gas turbine was started and then held at a load of 5 MW. It is concluded that the evaporator with horizontal boiler-utilizer piping built for operation with repeated forced circulation can operate reliably for long periods in a natural circulation regime.

About the authors

K. A. Pleshanov

JSC Machine-Building Factory of Podolsk (ZIO); National Research University “Moscow Power Engineering Institute”

Email: sterkhovkv@gmail.com
Russian Federation, Podolsk, Moscow oblast’; Moscow

K. V. Sterkhov

JSC Machine-Building Factory of Podolsk (ZIO)

Author for correspondence.
Email: sterkhovkv@gmail.com
Russian Federation, Podolsk, Moscow oblast’

P. V. Roslyakov

National Research University “Moscow Power Engineering Institute”

Email: sterkhovkv@gmail.com
Russian Federation, Moscow


Copyright (c) 2016 Springer Science+Business Media New York

This website uses cookies

You consent to our cookies if you continue to use our website.

About Cookies