Arrangement of Run-of-the-River Symmetrical Hydropower Plants and Principal Results of a Computer Study of Flow in Their Turbine Units
- Authors: Morgunov G.M.1
-
Affiliations:
- Moscow Power Engineering Institute, National Research University
- Issue: Vol 50, No 2 (2016)
- Pages: 147-151
- Section: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/245124
- DOI: https://doi.org/10.1007/s10749-016-0675-x
- ID: 245124
Cite item
Abstract
A diagrammed arrangement of dams and station assemblies for symmetrical HPP are presented. Principal results of the design and 3D hydrodynamic computer simulation of low-head flow in a turbine unit are discussed for a traditional HPP and in a centrally symmetrical turbine unit of symmetrical HPPs, with confirmation of predicted fundamentally higher power efficiency of the new design.