Power Schedule Optimization of the PIK Reactor to Accelerate Power Buildup During Startup
- 作者: Degtyarev A.M.1, Myasnikov A.A.1, Trofimova T.E.1, Seryanina O.A.2, Sorokin S.E.3
-
隶属关系:
- National Research Center Kurchatov Institute
- National Research Nuclear University MEPhI (Moscow Engineering Physics Institute)
- Afrikantov Experimental Design Bureau of Mechanical Engineering (OKBM Afrikantov)
- 期: 卷 126, 编号 3 (2019)
- 页面: 163-168
- 栏目: Article
- URL: https://journals.rcsi.science/1063-4258/article/view/249223
- DOI: https://doi.org/10.1007/s10512-019-00531-3
- ID: 249223
如何引用文章
详细
The possibility of accelerating power buildup in the PIK reactor during startup by optimizing the power schedule is investigated. The analysis concerns the neutronic aspects and takes into account xenon processes, fuel burnup, and limits on reactivity excess and reactor power. A numerical method based on the principle of optimality with reactor power as a control is used to solve the problem. It is shown for one of the power start-up phases of the PIK reactor that optimization of the power schedule makes it possible to accelerate the passage of the phase by 1/4 as compared with a four-step power schedule. The possibility of optimal passage of a portion of the phase in the self-regulation regime of the reactor is considered. It is established that this regime is unstable for the actual power range in practice.
作者简介
A. Degtyarev
National Research Center Kurchatov Institute
编辑信件的主要联系方式.
Email: degtyarev_am@nrcki.ru
俄罗斯联邦, Moscow
A. Myasnikov
National Research Center Kurchatov Institute
Email: degtyarev_am@nrcki.ru
俄罗斯联邦, Moscow
T. Trofimova
National Research Center Kurchatov Institute
Email: degtyarev_am@nrcki.ru
俄罗斯联邦, Moscow
O. Seryanina
National Research Nuclear University MEPhI (Moscow Engineering Physics Institute)
Email: degtyarev_am@nrcki.ru
俄罗斯联邦, Moscow
S. Sorokin
Afrikantov Experimental Design Bureau of Mechanical Engineering (OKBM Afrikantov)
Email: degtyarev_am@nrcki.ru
俄罗斯联邦, Nizhnii Novgorod
补充文件
