Impact of the Length of Manoeuvering Roads of a Bucket Wheel Excavator for Working Times in the Shortwall


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

The article presents one of the possibilities of using a bucket wheel excavator technology (with a daily capacity of over 100,000 m3) when removing an overburden on the stabilised front in the opencast lignite mine. The influence of excavator manoeuvring movements on the choice of parameters of operational floors is discussed. The assessment of the efficiency of the work process was made, among other things, while maintaining the required safety conditions and geometric parameters of the working front. It has been shown that in the bucket wheel excavator’s over-elevation work with variable variants of vertical and horizontal division (for a given floor height), the length of manoeuvring roads on the operational front is more favourable than the working technology of the entire height of the floor.

作者简介

M. Sowała

Wroclaw University of Science and Technology

Email: justyna.wozniak@pwr.edu.pl
波兰, Wroclaw

A. Strempski

Wroclaw University of Science and Technology

Email: justyna.wozniak@pwr.edu.pl
波兰, Wroclaw

J. Woźniak

Wroclaw University of Science and Technology

编辑信件的主要联系方式.
Email: justyna.wozniak@pwr.edu.pl
波兰, Wroclaw

K. Pactwa

Wroclaw University of Science and Technology

Email: justyna.wozniak@pwr.edu.pl
波兰, Wroclaw

补充文件

附件文件
动作
1. JATS XML

版权所有 © Pleiades Publishing, Inc., 2019