Erratum to: “Optimal extraction sequence modeling for open pit mining operation considering the dynamic cutoff grade”


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

In the published version there is an error in the title. The present form in this erratum is the correct: Optimal Cutoff Grades Modeling for Open Pit Mining Operations during Mining Sequences.

作者简介

E. Moosavi

Department of Mining Engineering, South Tehran Branch

编辑信件的主要联系方式.
Email: se.moosavi@yahoo.com
伊朗伊斯兰共和国, Tehran

J. Gholamnejad

Department of Mining and Metallurgical Engineering

Email: se.moosavi@yahoo.com
伊朗伊斯兰共和国, Yazd

补充文件

附件文件
动作
1. JATS XML

版权所有 © Pleiades Publishing, Ltd., 2016