Features of Hydraulic Fill Formation in Mining Water-Bearing Lignite Deposit


Citar

Texto integral

Acesso aberto Acesso aberto
Acesso é fechado Acesso está concedido
Acesso é fechado Somente assinantes

Resumo

Overburden dumping in hydraulic fill inside mined-out open pit is discussed. Features of hydraulic filling in an open pit at a gently dipping water-bearing lignite deposit without its drainage are presented. Parameters of hydraulic fill are correlated with hydraulic filling methods. Expediency of hydraulic fill formation without a dike is specified.

Sobre autores

V. Cheskidov

Chinakal Institute of Mining, Siberian Branch

Autor responsável pela correspondência
Email: cheskid@misd.nsc.ru
Rússia, Novosibirsk, 630091

A. Reznik

Chinakal Institute of Mining, Siberian Branch

Email: cheskid@misd.nsc.ru
Rússia, Novosibirsk, 630091

Arquivos suplementares

Arquivos suplementares
Ação
1. JATS XML

Declaração de direitos autorais © Pleiades Publishing, Inc., 2019