Experimental Investigation of Underground Mining of High-Grade Quarts in Kyshtym Mine


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

Application of a geotechnology used in high-grade quarts mining in Kyshtym Mine is studied. The room-and-pillar method is trialed, and the actual mining performance is assessed. The potential benefits of the geotechnology are evaluated. The air-decoupled charges without inert filler are designed and tested for fan pattern blasting. Size distribution of broken ore is estimated, and optimal parameters of blasting and powder factor are determined. The feasibility of quartz loss reduction by 3 times owing to extraction of useful mineral from pillars and due to decreased yield of overground quartz by 25–40% is proved.

作者简介

I. Sokolov

Institute of Mining, Ural Branch

编辑信件的主要联系方式.
Email: geotech@igduran.ru
俄罗斯联邦, Yekaterinburg, 620075

A. Smirnov

Institute of Mining, Ural Branch

Email: geotech@igduran.ru
俄罗斯联邦, Yekaterinburg, 620075

Yu. Antipin

Institute of Mining, Ural Branch

Email: geotech@igduran.ru
俄罗斯联邦, Yekaterinburg, 620075

K. Baranovsky

Institute of Mining, Ural Branch

Email: geotech@igduran.ru
俄罗斯联邦, Yekaterinburg, 620075

I. Nikitin

Institute of Mining, Ural Branch

Email: geotech@igduran.ru
俄罗斯联邦, Yekaterinburg, 620075

A. Rozhkov

Institute of Mining, Ural Branch

Email: geotech@igduran.ru
俄罗斯联邦, Yekaterinburg, 620075

补充文件

附件文件
动作
1. JATS XML

版权所有 © Pleiades Publishing, Ltd., 2018