Finding Forces Required to Change Air Hammer Path in Soil


Дәйексөз келтіру

Толық мәтін

Ашық рұқсат Ашық рұқсат
Рұқсат жабық Рұқсат берілді
Рұқсат жабық Тек жазылушылар үшін

Аннотация

The authors solve the problem on forces required to change drilling path of air hammers in soil. Soil mass is assumed a rigid–plastic medium with the Mohr–Coulomb yield, and the air hammer deviator is considered as a nondeformable body. The problem is solved in two stages: introduction of the deviator in soil and travel of the air hammer in soil with the rear deviated at a certain angle. The loads applied to the rear, the forces and the moment required to changing the path of an air hammer in soil are calculated.

Авторлар туралы

B. Danilov

Chinakal Institute of Mining, Siberian Branch

Email: bsmol@misd.ru
Ресей, Krasnyi pr. 54, Novosibirsk, 630091

B. Smolyanitsky

Chinakal Institute of Mining, Siberian Branch; Siberian State Transport University

Хат алмасуға жауапты Автор.
Email: bsmol@misd.ru
Ресей, Krasnyi pr. 54, Novosibirsk, 630091; ul. D. Kovalchuk 191, Novosibirsk, 630049

A. Chanyshev

Chinakal Institute of Mining, Siberian Branch; Novosibirsk State University of Economics and Management

Email: bsmol@misd.ru
Ресей, Krasnyi pr. 54, Novosibirsk, 630091; ul. Kamenskaya 56, Novosibirsk, 630099

D. Cheshchin

Chinakal Institute of Mining, Siberian Branch

Email: bsmol@misd.ru
Ресей, Krasnyi pr. 54, Novosibirsk, 630091

Қосымша файлдар

Қосымша файлдар
Әрекет
1. JATS XML

© Pleiades Publishing, Ltd., 2017