Methodological basis for calculating parameters of direct dumping flowsheets in open pit mining of gently dipping coal beds
- 作者: Reznik A.V.1, Cheskidov V.I.1, Bobyl’sky A.S.1
-
隶属关系:
- Chinakal Institute of Mining, Siberian Branch
- 期: 卷 53, 编号 2 (2017)
- 页面: 299-304
- 栏目: Mineral Mining Technology
- URL: https://journals.rcsi.science/1062-7391/article/view/184123
- DOI: https://doi.org/10.1134/S1062739117022151
- ID: 184123
如何引用文章
详细
Under discussion are the direct dumping flowsheets applied to remove lower overburden layers at coal series deposits in Kuzbass. The authors present the calculation procedure for the parameters of overburden excavation and re-excavation flowsheets using draglines. It is found how the re-excavation coefficient depends on the place and level of the dragline site. The recommendations on selecting the dragline route in internal dumping are made. The main trends toward expanding the area of application of the direct dumping technology are identified.
作者简介
A. Reznik
Chinakal Institute of Mining, Siberian Branch
Email: cheskid@misd.nsc.ru
俄罗斯联邦, Krasnyi pr. 54, Novosibirsk, 630091
V. Cheskidov
Chinakal Institute of Mining, Siberian Branch
编辑信件的主要联系方式.
Email: cheskid@misd.nsc.ru
俄罗斯联邦, Krasnyi pr. 54, Novosibirsk, 630091
A. Bobyl’sky
Chinakal Institute of Mining, Siberian Branch
Email: cheskid@misd.nsc.ru
俄罗斯联邦, Krasnyi pr. 54, Novosibirsk, 630091
补充文件
