Using a multifuel gas generator in blast-furnace shops


Cite item

Full Text

Open Access Open Access
Restricted Access Access granted
Restricted Access Subscription Access

Abstract

The use of pulverized coal in Russian blast furnaces is analyzed. It is shown that the rates of pulverized- coal injection are considerably less than for the world’s best furnaces. The factors hindering such developments in Russia are presented. Measures intended to reduce carbon-dioxide emissions in hot-metal production (the ULCOS program) are analyzed. The introduction of multifuel gas generators of bubbling type in blast-furnace shops is proposed. The hot reducing gases produced in this system will then be injected in the blast furnaces. The operational parameters of a 1033-m3 blast furnace with the injection of hot reducing gases at rates up to 400 m3/t of hot metal are calculated. The injection of hot reducing gases at a rate of 400 m3/t would save coke at a rate of 100–120 kg/t of hot metal. With gas injection at a rate of 700 m3/t, the expected coke savings are as much as 200 kg/t of hot metal. The creation of a consortium of leading steelmakers to develop this technology to the point of industrial trials is recommended.

About the authors

G. S. Podgorodetskii

Moscow Institute of Steel and Alloys

Author for correspondence.
Email: podgs@misis.ru
Russian Federation, Moscow

A. A. Tretyak

OAO Chermetinformatsiya

Email: podgs@misis.ru
Russian Federation, Moscow

V. B. Gorbunov

Moscow Institute of Steel and Alloys

Email: podgs@misis.ru
Russian Federation, Moscow

L. A. Polulyakh

Moscow Institute of Steel and Alloys

Email: podgs@misis.ru
Russian Federation, Moscow

Supplementary files

Supplementary Files
Action
1. JATS XML

Copyright (c) 2016 Allerton Press, Inc.