Influence assessment of shut-in duration and well startup sequence in different geological and field conditions
- Authors: Grezin A.V.1, Sagitov D.K.2
-
Affiliations:
- Ufa State Petroleum Technological University
- Ufa State Petroleum Technical University
- Issue: No 2 (2024)
- Pages: 67-78
- Section: DRILLING OF WELLS AND FIELDS DEVELOPMENT
- URL: https://journals.rcsi.science/0445-0108/article/view/357205
- DOI: https://doi.org/10.31660/0445-0108-2024-2-67-78
- ID: 357205
Cite item
Full Text
Abstract
During 2019-2021, about half of well stock at West Siberian oil fields were shut down for a long period (up to one and a half year) due to oil production restrictions under the agreement between Russia and OPEC (Organization of the Petroleum Exporting Countries). There have never been such large-scale and prolonged shutdowns before. After starting from a long-term shutdown, the flow rate of some wells increased, while others decreased.The main aim of research is to assess the geological and technological factors affecting the results of starting wells after a long shutdown. Statistical methods were used, including multivariate regression analysis, assessing the influence of parameters on each other using trend lines on cross-plots, as well as constructing and comparing maps of geological and technological parameters.As a result, the influence of the duration of downtime, the simultaneity of shutdown of production and injection wells and compensation of production by injection was determined. That will help to reduce losses in case of repeated production restrictions by selecting optimal candidates for shutdown.
About the authors
A. V. Grezin
Ufa State Petroleum Technological University
Email: grezin_86@mail.ru
D. K. Sagitov
Ufa State Petroleum Technical University
References
Reservoir Commentary : Potential Implications of Long-Term Shut-Ins on Reservoir. –doi: 10.2118/0720-0031-JPT. – Direct text // Journal of Petroleum Technology. – 2020. – Vol. 72, Issue 07. – Р. 31–33. Ровинский, М. В. Результаты остановки скважин объекта АВ1-2 Урьевского месторождения по ограничению ОПЕК / М. В. Ровинский, В. В. Реймер, Р. Р. Хафизов. – doi: 10.33285/0207-2351-2022-12(648)-58-62. – Текст : непосредственный // Нефтепромысловое дело. – 2022. – № 12 (648). – С. 58–62. Impact of Temporary Well Shut-Ins on Unconventional Reservoir Performance / T. Firincioglu, B. Basbug, M. Freeman. – Text : electronic // NITEC LLC Research White Paper. – 2020. – URL: http://www.nitecllc.com/wpcontent/uploads/2016/02/Impact-of-Temporary-Well-Shut-ins-on-UC-Reservoir-Performance_20200525.pdf. Дьячук, И. А. Анализ временной остановки эксплуатационных скважин на завершающей стадии разработки и приблизительная оценка скорости накопления остаточной нефти / И. А. Дьячук, Е. В. Князева, Н. С. Кутуков. – Текст : непосредственный // Георесурсы. – 2013. – № 4 (54). – С. 72–78. Jacobs, T. The Great Shale Shut-In Uncharted Territory for Technical Experts / T. Jacobs. – doi: 10.2118/0620-0024-JPT – Direct text // Journal of Petroleum Technology. – 2020. – Vol. 72, Issue 06. – P. 24–27. Янин, А. Н. Влияние простоев добывающих скважин на нефтеотдачу прерывистых пластов / А. Н. Янин, Р. А. Закирова. – Текст : непосредственный // Бурение и нефть. – 2010. – № 3. – С. 18–21. Савенков, В. Ю. Оценка влияния преждевременного выключения скважин на эффективность выработки запасов : специальность 25.00.17 «Разработка и эксплуатация нефтяных и газовых месторождений» : диссертация на соискание ученой степени кандидата технических наук / Савенков Виталий Юрьевич ; Российский государственный университет нефти и газа имени И. М. Губкина. – Москва, 2002. – 166 с. – Текст : непосредственный. Совершенствование методов оценки и планирования геологотехнических мероприятий на базе статистических данных / В. С. Никитин, С. Д. Глебов, Д. К. Сагитов, А. А. Махмутов. – Текст : непосредственный // Нефтепромысловое дело. – 2014. – № 12. – С. 26–29.
Supplementary files
