Intelligent Planning Reliability-Based Inspections of Fatigued Structures for the Crack Initiation Period in the Weibull Case under Parametric Uncertainty


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

In this paper, periodic inspections of fatigued structures, which are common practice in order to maintain their reliability above a desired minimum level, are based on the conditional reliability of the structure. It is assumed that only the functional form of the underlying distribution of time to crack initiation (when a technically detectable crack is present) is specified, but some or all of its parameters are unspecified. The new technique of intelligent planning is proposed in this paper to construct more accurate reliability-based and cost-effective inspections of fatigued structures with decreasing intervals (as alternative to constant intervals) for the crack initiation period in the Weibull case under parametric uncertainty. The technique is conceptually simple and easy to use. To illustrate the suggested technique some numerical examples are given.

作者简介

N. Nechval

BVEF Research Institute

编辑信件的主要联系方式.
Email: nechval@junik.lv
拉脱维亚, Riga, LV-1050

G. Berzins

BVEF Research Institute

Email: nechval@junik.lv
拉脱维亚, Riga, LV-1050

K. Nechval

Aviation Department

Email: nechval@junik.lv
拉脱维亚, Riga, LV-1019

补充文件

附件文件
动作
1. JATS XML

版权所有 © Allerton Press, Inc., 2018