Intelligent Planning Reliability-Based Inspections of Fatigued Structures for the Crack Initiation Period in the Weibull Case under Parametric Uncertainty
- 作者: Nechval N.A.1, Berzins G.1, Nechval K.N.2
-
隶属关系:
- BVEF Research Institute
- Aviation Department
- 期: 卷 52, 编号 3 (2018)
- 页面: 184-197
- 栏目: Article
- URL: https://journals.rcsi.science/0146-4116/article/view/175486
- DOI: https://doi.org/10.3103/S0146411618030094
- ID: 175486
如何引用文章
详细
In this paper, periodic inspections of fatigued structures, which are common practice in order to maintain their reliability above a desired minimum level, are based on the conditional reliability of the structure. It is assumed that only the functional form of the underlying distribution of time to crack initiation (when a technically detectable crack is present) is specified, but some or all of its parameters are unspecified. The new technique of intelligent planning is proposed in this paper to construct more accurate reliability-based and cost-effective inspections of fatigued structures with decreasing intervals (as alternative to constant intervals) for the crack initiation period in the Weibull case under parametric uncertainty. The technique is conceptually simple and easy to use. To illustrate the suggested technique some numerical examples are given.
作者简介
N. Nechval
BVEF Research Institute
编辑信件的主要联系方式.
Email: nechval@junik.lv
拉脱维亚, Riga, LV-1050
G. Berzins
BVEF Research Institute
Email: nechval@junik.lv
拉脱维亚, Riga, LV-1050
K. Nechval
Aviation Department
Email: nechval@junik.lv
拉脱维亚, Riga, LV-1019
补充文件
