Development of the Technologies for Stabilization Treatment of the Water of the Recycling Cooling Systems at Thermal Power Plants
- Authors: Vlasov S.M.1, Chichirova N.D.1, Chichirov A.A.1, Vlasova A.Y.1, Filimonova A.A.1, Prosvirnina D.V.1
-
Affiliations:
- Kazan State Power Engineering University
- Issue: Vol 65, No 2 (2018)
- Pages: 115-119
- Section: Water Treatment and Water Chemistry
- URL: https://journals.rcsi.science/0040-6015/article/view/172941
- DOI: https://doi.org/10.1134/S0040601518020076
- ID: 172941
Cite item
Abstract
A turbine-condensate cooling system is one of the less stable and most hard-to-control systems of maintaining optimal water chemistry. A laboratory recycling cooling water test facility, UVO-0.3, was developed for physical simulation of innovative zero-discharge water chemistry conditions and improvement of technological flowcharts of stabilization treatment of the initial and circulating water of the recycling cooling systems at thermal power plants. Experiments were conducted in the UVO-0.3 facility to investigate the processes that occur in the recycling water supply system and master new technologies of stabilization of the initial and circulating water. It is shown that, when using untreated initial water, scaling cannot be prevented even under low concentration levels. The main reason for the activation of scale depositing is the desorption of carbon dioxide that results in alkalization of the circulating water and, as a consequence, a displacement of the chemical reaction equilibrium towards the formation of slightly soluble hardness ions. Some techniques, viz., liming and alkalization of the initial water and the by-pass treatment of the circulating water, are considered. New engineering solutions have been developed for reducing the amount of scale-forming substances in the initial and circulating water. The best results were obtained by pretreating the initial water with alkalizing agents and simultaneously bypassing and treating part of the circulating water. The obtained experimental data underlie the process flowcharts of stabilization treatment of the initial and circulating TPP water that ensure scale-free and noncorrosive operation and meet the corresponding environmental requirements. Under the bypassing, the specific rates of the agents and the residual hardness are reduced compared with the conventional pretreatment.
About the authors
S. M. Vlasov
Kazan State Power Engineering University
Email: aachichirova@mail.ru
Russian Federation, Kazan, 420066
N. D. Chichirova
Kazan State Power Engineering University
Email: aachichirova@mail.ru
Russian Federation, Kazan, 420066
A. A. Chichirov
Kazan State Power Engineering University
Email: aachichirova@mail.ru
Russian Federation, Kazan, 420066
A. Yu. Vlasova
Kazan State Power Engineering University
Email: aachichirova@mail.ru
Russian Federation, Kazan, 420066
A. A. Filimonova
Kazan State Power Engineering University
Author for correspondence.
Email: aachichirova@mail.ru
Russian Federation, Kazan, 420066
D. V. Prosvirnina
Kazan State Power Engineering University
Email: aachichirova@mail.ru
Russian Federation, Kazan, 420066
Supplementary files