Evaluation of the Selection of Casing and Tubing Size in a Foreign Oil Field


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

A procedure for determining the correspondence between production and completion engineering and casing and tubing sizes, and the related requirements of completion engineering for an oilfield in the Sahara desert is developed. Statistical analysis of the wellbore structure of a well cluster and an analysis of the current structure lead us to recommend appropriate wellbore structure systems for the oilfield. The study is of great significance for desert oilfields similar to the present oilfield, specifically in the selection of casing and tubing sizes and in the development of the wellbore structure.

作者简介

Zhang Tian-jin

College of Petroleum and Environmental Engineering, Yanan University

Email: bortum@mail.ru
中国, Yanan

Kong Xiangji

CNODC

Email: bortum@mail.ru
中国, Beijing

Qian Feng

CNODC

Email: bortum@mail.ru
中国, Beijing

Sun Tengfei

CNOOC Research Institute

Email: bortum@mail.ru
中国, Beijing


版权所有 © Springer Science+Business Media, LLC, part of Springer Nature, 2017
##common.cookie##