Numerical Model for Evaluating Well Kick and Lost Circulation During Managed Pressure Drilling


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

Based on the rapidly varying casing pressure method and multiphase flow theory, we have constructed a transient mathematical model for managed pressure drilling (MPD) that combines kick with mud loss in a single fracture. The finite difference method was used to iteratively solve this model. The model calculated values agree well with the experimental results, which confirms the reliability of the model. Casing pressure, casing shoe pressure, pit gain, outlet flow, and choke opening during the entire well control process are analyzed. Experimental results show that equality of inlet flow and outlet flow may not imply influx stoppage when a kick is coupled with mud loss. In addition, the loss rate at the casing shoe initially increases linearly over time and then decreases exponentially, ultimately becoming constant. After completion of well control, drilling can be safely continued until loss is negligible. This study may provide a theoretical basis for better control of wells with complicated kick and circulation loss in managed pressure drilling (MPD).

作者简介

Jun Li

Department of Oil-Gas Well Engineering, China University of Petroleum

Email: bortum@mail.ru
中国, Beijing

Miao He

Department of Oil-Gas Well Engineering, China University of Petroleum

Email: bortum@mail.ru
中国, Beijing

Hui Zhang

Department of Oil-Gas Well Engineering, China University of Petroleum

Email: bortum@mail.ru
中国, Beijing

Gonghui Liu

Department of Oil-Gas Well Engineering, China University of Petroleum; Beijing University of Technology

Email: bortum@mail.ru
中国, Beijing; Beijing

Tengfei Sun

CNOOC Research Institute

Email: bortum@mail.ru
中国, Beijing

补充文件

附件文件
动作
1. JATS XML

版权所有 © Springer Science+Business Media, LLC, part of Springer Nature, 2017