Inflow Performance Relationship (IPR) Equation for a Damaged Well in Solution-Gas Drive Production
- 作者: Ren Z.1, Wu X.1, Li H.1
-
隶属关系:
- MOE Key Laboratory of Petroleum Engineering in China University of Petroleum
- 期: 卷 52, 编号 6 (2017)
- 页面: 736-743
- 栏目: Article
- URL: https://journals.rcsi.science/0009-3092/article/view/234789
- DOI: https://doi.org/10.1007/s10553-017-0767-9
- ID: 234789
如何引用文章
详细
We have analyzed Standing’s equation for a damaged well and have identified its problems, and have taken them into account to develop a new inflow equation to predict productivity for a damaged well in solution-gas drive production. For comparison, we used both equations to calculate the inflow performance relationship (IPR) curves and have established that the calculation results are quite different. We have demonstrated the validity of the new equation. We have derived a formula for calculating the flow efficiency of the well.
作者简介
Zongxiao Ren
MOE Key Laboratory of Petroleum Engineering in China University of Petroleum
编辑信件的主要联系方式.
Email: 765802228@qq.com
中国, Beijing, 102249
Xiaodong Wu
MOE Key Laboratory of Petroleum Engineering in China University of Petroleum
Email: 765802228@qq.com
中国, Beijing, 102249
Hui Li
MOE Key Laboratory of Petroleum Engineering in China University of Petroleum
Email: 765802228@qq.com
中国, Beijing, 102249
补充文件
