Development of Hybrid Equipment for Well Drilling and Hydrocarbon Production from Offshore Deposits
- Authors: Sazonov Y.A.1, Mokhov M.A.1
-
Affiliations:
- Gubkin Russian State University of Oil and Gas
- Issue: Vol 53, No 3-4 (2017)
- Pages: 155-159
- Section: Article
- URL: https://journals.rcsi.science/0009-2355/article/view/235461
- DOI: https://doi.org/10.1007/s10556-017-0313-y
- ID: 235461
Cite item
Abstract
Efficient reservoir pressure utilization is a promising research direction for reducing energy and financial costs of hydrocarbon production from offshore deposits. A design and a description of the principle of operation of a turbine power block having a dynamic separator are given. The developed mathematical models and computer simulation confirmed the potential of this research direction.
About the authors
Yu. A. Sazonov
Gubkin Russian State University of Oil and Gas
Email: gasseparator@mail.ru
Russian Federation, Moscow
M. A. Mokhov
Gubkin Russian State University of Oil and Gas
Author for correspondence.
Email: gasseparator@mail.ru
Russian Federation, Moscow