Қазақстанда мұнай ұңғымасын оқшаулау үшін PROMILL технологиясын сәтті пайдалану
- Авторлар: Ермеков М.1, Мұстафин Т.1
-
Мекемелер:
- Wellbore Integrity Solutions
- Шығарылым: Том 7, № 2 (2025)
- Беттер: 51-60
- Бөлім: Oil and gas field development and exploitation
- URL: https://journals.rcsi.science/2707-4226/article/view/310168
- DOI: https://doi.org/10.54859/kjogi108842
- ID: 310168
Дәйексөз келтіру
Толық мәтін
Аннотация
The article presents the known technological causes of the overflow of the water-gas mixture and reservoir fluid in the behind-the-casing space of a cemented oil and gas well and through a cement plug, and the complications to which they can lead.
Continuous work to improve well abandonment technology allowed Wellbore Integrity Solutions to create a highly efficient ProMILL™ system in 2016. The ProMILL system combines a Bridge Plug assembly, a Section Mill, and a high-ratio Underreamer to prepare the foundation for a cement barrier in a single run. During the milling and expansion process, it eradicates all leak paths from the cement fill, while achieving continuous, reliable rock-to-rock zonal isolation.
Was presented the results of the successful execution of the First ProMILL Job in Kazakhstan onshore - successful deployment of the 5500 ProMILL for high-grade section milling and outer casing ID scraping in one trip.
Толық мәтін
##article.viewOnOriginalSite##Авторлар туралы
М. Ермеков
Wellbore Integrity Solutions
Хат алмасуға жауапты Автор.
Email: milbor090@gmail.com
ORCID iD: 0009-0003-1106-2514
докт. техн. наук
АҚШ, Хьюстон қаласыТ. Мұстафин
Wellbore Integrity Solutions
Email: timur.mustafin@wellboreintegrity.com
ORCID iD: 0009-0003-4105-3328
АҚШ, Хьюстон қаласы
Әдебиет тізімі
- Chukwuemeka A.O., Oluyemia G., Mohammed A.I., Njuguna J. Plug and abandonment of oil and gas wells – A comprehensive review of regulations, practices, and related impact of materials selection // Geoenergy Science and Engineering. 2023. Vol. 226. doi: 10.1016/j.geoen.2023.211718.
- wellboreintegrity.com [интернет]. ProMILL™ Milling and Underreaming System WIS. Дата обращения: 12.02.2025. Доступ по ссылке: https://www.wellboreintegrity.com.
- wellboreintegrity.com [интернет]. Well Abandonment & Slot Recovery Systems, 2024. Дата обращения: 12.02.2025. Доступ по ссылке: https://www.wellboreintegrity.com/RedBaron.
- blog.wellcem.com [интернет]. Plug and abandonment of oil and gas wells: Different materials, 2017. Дата обращения: 17.02.2025. Доступ по ссылке: https://www.blog.wellcem.com.
- wellboreintegrity.com [интернет]. Sustained Casing Pressure Brochure. Дата обращения: 17.02.2025. Доступ по ссылке: https://www.wellboreintegrity.com/RedBaron.
- wellboreintegrity.com [интернет]. Expanding into New Regions: Successful Execution of the First ProMILL™ Job in Central Asia – Kazakhstan Onshore. Дата обращения: 20.02.2025. Доступ по ссылке: https://www.wellboreintegrity.com.
Қосымша файлдар
