On computational complexity of the electric power flow optimization problem in market environment


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

Under consideration is the electric power flow optimization problem for an electric power system which typically arises in calculation of electrical power auctions in the “day-ahead” and balancing markets. It was established that the problem of finding a feasible flow in the balancing market is NP-hard in the strong sense even in case of one generator. The problem of finding an optimal flow in the day-ahead market is proved to be NP-hard even with one generator and without controlled cuts.

作者简介

A. Eremeev

Sobolev Institute of Mathematics; Dostoevskii Omsk State University

编辑信件的主要联系方式.
Email: eremeev@ofim.oscsbras.ru
俄罗斯联邦, pr. Akad. Koptyuga 4, Novosibirsk, 630090; pr.Mira 55A, Omsk, 644077

补充文件

附件文件
动作
1. JATS XML

版权所有 © Pleiades Publishing, Ltd., 2017