Determining the Elevations of Industrial Sites of Nuclear Power Plants Located in Floodplains


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

A method is proposed for determining the elevations of industrial sites of NPPs and other high-risk facilities located near water channels and water bodies, and is based on constructing a curve that associates water level with the probability of reaching these levels in a broad range of variation of probabilities. This makes it possible to enhance the reliability of determining the elevation of flooding for an assumed probability, ensure invariance to the standards of project design, and evaluate the effectiveness of the magnitude of the required reserve. A description of the method of constructing such a curve is presented using the example of the Rooppur NPP under project on the Ganges River (Republic of Bangladesh). The calculations employ both the method of extrapolation of field data and numerical hydrodynamic modeling of a combination of several hydrometeorological phenomena of rare repeatability, in order to determine the maximum levels of high waters, including taking into account possible climate changes. An evaluation of the risks of flooding of the industrial site was conducted, and an optimum elevation from the point of view of risk minimization was obtained.

作者简介

V. Belikov

Institute of Water Problems of the Russian Academy of Sciences

编辑信件的主要联系方式.
Email: belvv@bk.ru
俄罗斯联邦, Moscow

A. Aleksyuk

Institute of Water Problems of the Russian Academy of Sciences

Email: belvv@bk.ru
俄罗斯联邦, Moscow

N. Borisova

Institute of Water Problems of the Russian Academy of Sciences

Email: belvv@bk.ru
俄罗斯联邦, Moscow

S. Norin

Institute of Water Problems of the Russian Academy of Sciences

Email: belvv@bk.ru
俄罗斯联邦, Moscow

A. Rumyantsev

Institute of Water Problems of the Russian Academy of Sciences

Email: belvv@bk.ru
俄罗斯联邦, Moscow


版权所有 © Springer Science+Business Media, LLC, part of Springer Nature, 2019
##common.cookie##