Condition of the Gotsatli Hydroelectric Power Plant Dam During Filling of the Reservoir According to Field Observations and Numerical Modeling


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

Information on an evaluation of the condition of the Gotsatli hydroelectric station earth dam during filling of the reservoir and the results of field observations and numerical modeling are given. The characteristics of the seepage regime of the dam and stress-strain state of the asphalt concrete diaphragm are revealed on the basis of the data otained.

作者简介

G. Denisov

JSC Lengidroproekt

编辑信件的主要联系方式.
Email: office@1hp.ru
俄罗斯联邦, St. Petersburg

O. Davydkin

JSC Lengidroproekt

Email: office@1hp.ru
俄罗斯联邦, St. Petersburg

K. Vorob’ev

JSC B. E. Vedeneev All-Russian Hydraulic Engineering Research Institute (VNIIG)

Email: office@1hp.ru
俄罗斯联邦, St. Petersburg

补充文件

附件文件
动作
1. JATS XML

版权所有 © Springer Science+Business Media, LLC, 2017