Determination of the Time-to-Saturation of Current Transformers in Short-Circuit Transient Regimes


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

The existing methods of calculating the time-to-saturation of CT are analyzed. Since cases of core saturation have been observed in class P CT with high primary current multiples for which incorrect actions of the relay protection devices occurred in short-circuit transient regimes, in the proposed standard GOST R “Measuring transformers: Part 2. Requirements of current transformers” the coefficient of the transient regime and the time-to-saturation of CT are introduced as characteristics of CT. Amethod developed by the present authors is proposed for calculating the indicated time. Conclusions are drawn about the applicability of the methods in practical calculations. The calculation of the time-to-saturation of CT installed in 500 kV outdoor switchgear in a large electric power plant is presented as an example.

作者简介

S. Kuzhekov

JSC “NPF Kvazar,”

编辑信件的主要联系方式.
Email: kuzhekov@mail.ru
俄罗斯联邦, Novocherkassk

A. Degtyarev

JSC “NPF Kvazar,”

Email: kuzhekov@mail.ru
俄罗斯联邦, Novocherkassk

V. Vorob’ev

JSC “Systems Operator of the Unified Energy System,”

Email: kuzhekov@mail.ru
俄罗斯联邦, Moscow

V. Moskalenko

JSC “Systems Operator of the Unified Energy System,”

Email: kuzhekov@mail.ru
俄罗斯联邦, Moscow

补充文件

附件文件
动作
1. JATS XML

版权所有 © Springer Science+Business Media, LLC, 2017