Uncertainty of Initial Information in Reliability Assessment of Concrete Dams (Within the Framework of Structural Theory)


Цитировать

Полный текст

Открытый доступ Открытый доступ
Доступ закрыт Доступ предоставлен
Доступ закрыт Только для подписчиков

Аннотация

Questions related to uncertainty in initial information that arise in reliability assessement of concrete gravity dams on bedrock foundations are considered from the standpoint of structural reliability theory. An application of the proposed technique of reliability assessment of structures is demonstrated, using as an example one section of the dam of the Krasnoyarsk hydroelectric power plant. It is shown that through a transition from a deterministic to a probabilistic method and further on to a possibility method a correct reliability assessment can be achieved under the conditions of high levels of uncertainty of the initial data.

Об авторах

A. Yudelevich

B. E. Vedeneev VNIIG

Автор, ответственный за переписку.
Email: YudelevichAM@vniig.ru
Россия, St. Petersburg


© Springer Science+Business Media, LLC, part of Springer Nature, 2018

Данный сайт использует cookie-файлы

Продолжая использовать наш сайт, вы даете согласие на обработку файлов cookie, которые обеспечивают правильную работу сайта.

О куки-файлах